<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>cyclesheffield back up site &#187; Graham Allsopp</title>
	<atom:link href="https://backup.cyclesheffield.org.uk/?author=9&#038;feed=rss2" rel="self" type="application/rss+xml" />
	<link>https://backup.cyclesheffield.org.uk</link>
	<description>back up site for cyclesheffield</description>
	<lastBuildDate>Wed, 01 Apr 2015 15:48:03 +0000</lastBuildDate>
	<language>en-GB</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
	<generator>https://wordpress.org/?v=4.1.31</generator>
	<item>
		<title>Loicher Bridge &#8211; January 2015 update</title>
		<link>https://backup.cyclesheffield.org.uk/?p=10860</link>
		<comments>https://backup.cyclesheffield.org.uk/?p=10860#comments</comments>
		<pubDate>Sun, 04 Jan 2015 18:03:12 +0000</pubDate>
		<dc:creator><![CDATA[Graham Allsopp]]></dc:creator>
				<category><![CDATA[news]]></category>

		<guid isPermaLink="false">http://www.cyclesheffield.org.uk/?p=10860</guid>
		<description><![CDATA[You may have been following the progress of the fate of Loicher Bridge (see News 14 November 2014 and 26 November 2014). Briefly, Loicher Bridge is a vital link carring the Chapeltown Greenway (also known as the Blackburn Valley Cycle Route) over Loicher Lane (SK364943). This route isn’t complete yet, but will offer a traffic-free &#8230; <a href="https://backup.cyclesheffield.org.uk/?p=10860" class="more-link">Continue reading <span class="screen-reader-text">Loicher Bridge &#8211; January 2015 update</span> <span class="meta-nav">&#8594;</span></a>]]></description>
				<content:encoded><![CDATA[<p>You may have been following the progress of the fate of Loicher Bridge (see News <a title="Disruption to the Chapeltown Greenway and demolition of the Loicher Lane bridge!?" href="http://www.cyclesheffield.org.uk/2014/11/14/disruption-to-the-chapeltown-greenway-and-demolition-of-the-loicher-lane-bridge/">14 November 2014</a> and <a title="Loicher Bridge update" href="http://www.cyclesheffield.org.uk/2014/11/26/loicher-bridge-update/">26 November 2014</a>).</p>
<p>Briefly, Loicher Bridge is a vital link carring the Chapeltown Greenway (also known as the Blackburn Valley Cycle Route) over Loicher Lane (SK364943). This route isn’t complete yet, but will offer a traffic-free route between Chapeltown and Meadowhall – an important route for both leisure and employment. The route is being developed and improved by Sheffield City Council (SCC) before being handed back to its owners &#8211;  Sustrans.</p>
<p>In October, a CycleSheffield member alerted us that Loicher Bridge was going to be demolished:</p>
<blockquote><p><i>&#8230;Loicher Lane bridge will be demolished (this is for financial reasons in the long term) and works done on the lane itself to provide a safer at grade crossing/access point&#8230;<br />
</i>[SCC email]</p></blockquote>
<p>They wrote back questioning the decision, and were told:</p>
<blockquote><p><i>&#8230;I completely agree with the fact that the bridge is a better alternative than an at grade crossing point. However, the scheme includes an access point and that cannot be safely achieved with the bridge abutment in place. Believe me, I have gone over countless options and none meet the necessary criteria for both design and safety.</i></p>
<p><i>The bridge span decking itself has been treated but the structural state of the bridge is poor and will require great expense even to keep in place, let alone replace.</i></p>
<p><i>By negotiation with local landowners we are in a position to improve sightlines all round to make the at grade crossing as save </i>[sic]<i> as possible. We will be including a speed limit reduction from the motorway bridge at 30mph, currently 60mph, and we are considering a point reduction to 20mph in the environs of the crossing&#8230;</i></p></blockquote>
<p>Over the next few weeks CycleSheffield members pushed for more information about the decision to demolish the bridge, and on 18 November, council officer Brian Dalton reported to SCC Cycle Forum:</p>
<blockquote><p><i>…Using current highway standards, it is not possible to make this access safe with the existing southern bridge abutment in place…<br />
</i><i>I have costed a replacement bridge and I am in the process of costing an at grade crossing point … I am leaning towards the no bridge option<br />
</i><i>…I have the written support of the Railway Paths bridge engineer for the removal of this bridge…</i></p></blockquote>
<p>[full text in <a title="Loicher Bridge update" href="http://www.cyclesheffield.org.uk/2014/11/26/loicher-bridge-update/">26 November 2014</a> news item]</p>
<p>We were so alarmed at this and the refusal of SCC to provide more information, that on 13 November 2014 we felt compelled to submit a <a href="https://www.whatdotheyknow.com/request/blackburn_valley_cycle_route_pro" target="_blank">Freedom of Information request</a> to get some answers.</p>
<p>From this we learned that:</p>
<ul>
<li>Agreements/contracts/tenders/estimates made with landowners since 2010 concerning the Blackburn Valley cycle route have been <strong>verbal only</strong></li>
<li>There are no recent (in past five years) structural reports, estimates, or documentation relating to the renovation of Loicher Bridge</li>
<li>There are no recent reports about safe access of Loicher Bridge</li>
<li>There are no recent costings for the demolition of Loicher Bridge</li>
<li>There are no recent costings for the replacement of Loicher Bridge</li>
<li>There are no recent costings for an at-grade crossing on the site of  Loicher Bridge</li>
</ul>
<p>All somewhat at odds to the October email and November Cycle Forum report.</p>
<p>As a result of this, CycleSheffield felt compelled to negotiate directly with Sustrans, the Trans Pennine Trail and Railways Paths Ltd (RPL) – a Sustrans company that will ultimately undertake ownership and maintainence of Loicher Bridge.</p>
<p>Subsequently, in late December, Mike Babbitt, Sustrans Project Manager for Yorkshire &amp; The Humber, and Paul Thomas, Bridge Engineer, RPL met with Brian Dalton of SCC. These were Mike Babbit’s comments to Brian Dalton as a result of that meeting.</p>
<blockquote><p><i>As the available sight lines for the existing access ramp to the south west of the bridge are poor, we considered all of the following alternative options:</i></p>
<ol>
<li><i>Removing the bridge and abutments entirely to create an at-grade crossing of greenway and road.  It seems that the only reason known to me for this option is to improve the sightline for the SW access ramp.  Removal of the bridge would require a bridge demolition together with a huge amount of earth shifting/removal to level the railway with the road &#8211; this would be expensive. An acceptable at-grade crossing (i.e. with priority for greenway users) would also need to be created and, given Sustrans’ fruitless attempt to get a priority crossing installed at Grange Lane to the south, this would be expensive and/or deemed unacceptable by SCC.</i></li>
<li><em>Installation of a new longer span cycle bridge at a raised height on wider abutments.  This option would also require a significant amount of earth shifting/removal, demolition and construction of at least one new abutment. A new steel bridge in itself would cost in the region of £30k and an added installation complication is the close proximity of the overhead cables. The gradient of the access ramp to the south west would need to be significantly improved to 1:20. This is therefore likely to be a very expensive option.</em></li>
<li><i>Improve the existing bridge and provide an alternative acceptable access ramp to Loicher Lane.  It seems that the existing access ramp and its inherently difficult sightlines due to the existing bridge abutments and road curvature are the principle reasons for your suggestion of options 1 and 2. I described to you the seemingly feasible option of ramping down alongside Loicher Lane to the south east of the bridge to join the road around the southern site access to the east and you agreed to investigate this further. This would have the benefit of giving greenway users longer sight of the road as they travelled down the ramp to meet it at a less problematic point. A first objection to this may be that a cyclist cycling up the hill to join the greenway has to go further. Although this may be true, the height gain to get to the greenway is achieved using a kinder gradient overall. There is also the option of ramping down to the north west of the bridge and you agreed to investigate this further. The required works to the existing bridge would be to bring in the parapets to go on top of the edge beams and remove the timber walkways together with any other remedial works required by RPL. Appropriate bridge lead-in railings would be required to guide users across the bridge.</i></li>
</ol>
</blockquote>
<p>Mike commented further to CycleSheffield:</p>
<blockquote><p><i>In my assessment of the above, option 1 is not an option due to the unlikelihood of achieving an acceptable at-grade crossing together with the likely high expense.  Option 2 would be acceptable to Sustrans (and probably RPL) but is likely to be very expensive.  Option 3 is acceptable provided that a safer access ramp can be provided and is likely to be the cheapest scheme.</i></p></blockquote>
<p>From all this, you will see that CycleSheffield’s original assertion has been confirmed:<br />
<b>The best and cheapest option for Loicher Bridge is to renovate the bridge and install a revised access ramp.</b></p>
<p>This does however, leave a whole host of other questions unanswered:</p>
<ul>
<li>Why council officers feel empowered to make verbal agreements with local landowners which involve demolition of major structures (which SCC doesn’t even own) without recourse to any other stakeholders</li>
<li>Why council officers can make statements both to CycleSheffield members and SCC Cycle Forum “<em>Loicher Lane bridge will be demolished (this is for financial reasons in the long term)</em>” “<em>I have gone over countless options</em>” “<em>I have costed a replacement bridge</em>” and imply that an at-grade crossing is viable, safer and cheaper, when none of these are true</li>
<li>Why council offers have been deliberately obstructive to what we consider are legitimate matters of public interest</li>
<li>Why CycleSheffield, the local cycling campaign and advocacy group, has to resort to Freedom of Information requests to get answers to these questions, and why there is a paucity of answers to these requests</li>
<li>Why CycleSheffield has been excluded from the development process for the Chapeltown Greenway</li>
<li>Why did CycleSheffield feel compelled to have to escalate their concerns to the ultimate owners of the Chapeltown Greenway – who subsequently offered solutions in line with CycleSheffield’s suggestions</li>
<li>Why CycleSheffield has again had to devote considerable volunteer resource into a project that should have been properly developed and managed by SCC</li>
</ul>
]]></content:encoded>
			<wfw:commentRss>https://backup.cyclesheffield.org.uk/?feed=rss2&#038;p=10860</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Loicher Bridge update</title>
		<link>https://backup.cyclesheffield.org.uk/?p=10802</link>
		<comments>https://backup.cyclesheffield.org.uk/?p=10802#comments</comments>
		<pubDate>Wed, 26 Nov 2014 23:02:24 +0000</pubDate>
		<dc:creator><![CDATA[Graham Allsopp]]></dc:creator>
				<category><![CDATA[news]]></category>

		<guid isPermaLink="false">http://www.cyclesheffield.org.uk/?p=10802</guid>
		<description><![CDATA[You might have read the recent post that Loicher Bridge in Ecclesfield, part of the nearly-completed Chapeltown Greenway/Blackburn Valley cycle route, is under threat of demolition. The plan is to replace the bridge with two ramps down to the road and a road crossing (an &#8220;at-grade&#8221; crossing&#8221;). CycleSheffield believes that demolition is totally unnecessary, the &#8230; <a href="https://backup.cyclesheffield.org.uk/?p=10802" class="more-link">Continue reading <span class="screen-reader-text">Loicher Bridge update</span> <span class="meta-nav">&#8594;</span></a>]]></description>
				<content:encoded><![CDATA[<p>You might have read the recent post that Loicher Bridge in Ecclesfield, part of the nearly-completed Chapeltown Greenway/Blackburn Valley cycle route, is under threat of demolition. The plan is to replace the bridge with two ramps down to the road and a road crossing (an &#8220;at-grade&#8221; crossing&#8221;). CycleSheffield believes that demolition is totally unnecessary, the replacement will be more costly, and most importantly, the new crossing will be more dangerous.</p>
<p>This report by Brian Dalton, council officer, was presented at the Sheffield City Council Cycle Forum on Tuesday 18 November:</p>
<blockquote><p><strong>Blackburn Valley at Loicher Lane</strong></p>
<p>The bridge over Loicher Lane which is part of the Blackburn Valley Green Route was built around 1860 and, at that time, Loicher Lane was twisted so the railway bridge could be as small as possible. This was all very well in the age of horse drawn vehicles, but, over the years this kink in the carriageway and the speed of traffic have developed into a danger to all users.</p>
<p>In the 1950’s a footway was created along Loicher Lane which crosses from the south side to the north under the bridge. This is to avoid making the kink worse and is positioned in such a way as to give pedestrians the best sightlines when crossing.</p>
<p>The planning consent for the cycle route through from Butterthwaite Lane to the Smithy Wood development, calls for an access point to the west of the southern bridge abutment. Using current highway standards, it is not possible to make this access safe with the existing southern bridge abutment in place. There is a choice, therefore, to use the bridge, while closing the temporary access, replace the bridge along with its southern abutment or remove the bridge and create an at grade crossing with appropriate sightlines.</p>
<p>I have costed a replacement bridge and I am in the process of costing an at grade crossing point. I have not come to any firm decision about what I will recommend but I am leaning towards the no bridge option. However, the costs involved in providing the safest possible at grade crossing may change that.</p>
<p>Despite what is said in the Cycle Sheffield note, I have the written support of the Railway Paths bridge engineer for the removal of this bridge. He added a caveat at the time that Sustrans should be consulted about the scheme for implementation. That would have been a given point in any case.</p>
<p>You may have noticed that things are starting to happen, the ski jump hump at Butterthwaite is gone, the redundant inline gates have been removed and the Chapeltown Park section is nearing completion. The path to the south of Loicher Lane is in design, but the crossing is a complex issue and will not be easy to solve, but I am determined to ensure that, whatever is implemented, it will give the widest population the greatest usefulness.</p></blockquote>
<p>In addition to Sheffield City Council (SCC), a number of agencies are involved in the fate of the bridge: Sustrans (who will be responsible for the route); Railway Paths Ltd (a division of Sustrans, who will own the bridge &#8211; it is currently leased to SCC); and the Trans Pennine Trail &#8211; this route will form part of their network. Yesterday, CycleSheffield sent this response to these partner agencies:</p>
<blockquote><p>A report about Loicher Bridge by Brian Dalton was presented to the Sheffield City Council (SCC) Cycle Forum on Tuesday 18 November. We believe that you have all now seen this report. We would like to challenge some of that report, have made another site visit and would like to make comments to interested parties.</p>
<p>We fundamentally believe that the retention of Loicher Bridge is essential to the coherence, continuity and safety of the Chapeltown Greenway/Blackburn Valley cycle route.</p>
<p>Loicher Bridge is structurally sound (&#8220;I am not aware of any defects that would make this bridge unable to carry the loading associated with carrying a cycle path&#8221; &#8211; Paul Thomas, Bridge Engineer, Sustrans / Railway Paths Limited (RPL); 18 Nov 2014). Inspecting the bridge today, there is no evidence of structural problems. There is no evidence of bridge strikes either on the abutments, or on the underside of the bridge itself.</p>
<p>We also refute the implication that Paul Thomas has &#8220;given written support &#8230; for the removal of this bridge&#8221;. In his email to CycleSheffield, Paul acknowledges there are two options: &#8220;I am keen to see this bridge either refurbished to create an appropriately robust structure for the cycle path or demolished as long as Sustrans agree that an acceptable solution has been found to allow public users to cross the road&#8221;, that both options should reduce RPL&#8217;s liabilities and future maintenance costs, and it is not his remit to make a recommendation in favour of either option.</p>
<p>Some minor works are needed to bring the bridge back to a state where it will not be a liability when handed back to RPL. This is now mainly removal of the wooden maintenance paths either side of the concrete bridge deck, and making safe the bridge railings. Plans for the refurbishment of the bridge to create an appropriately robust structure for the cycle path have been drawn up by SCC, some work (eg new deck) was completed, but then curiously abandoned before full completion. We would urge SCC to complete this refurbishment as soon as possible.</p>
<p>You will note from the report by Brian Dalton that the problem with Loicher Bridge does not lie with the bridge itself, but actually with the sightlines at the bottom of the temporary access ramp to the west of the southern abutment.</p>
<p>At the bottom of the ramp, sightlines for cyclists and pedestrians to the east (ie uphill) are quite poor &#8211; around 20 metres, though because of road position, traffic travelling downhill towards the bridge will have approximately double this &#8211; between 40 and 50 metres. Sightlines for all other directions are adequate.</p>
<p>The &#8220;kink&#8221; in the carriageway mentioned by Brian Dalton has the positive effect of slowing traffic travelling downhill. Part of the current SCC proposal is a 30mph limit from Jumble Lane (M1 bridge) &#8211; down from 60mph &#8211; together with point reduction to 20mph around to bridge, and we feel these will have a further positive effect, and should be introduced regardless. CycleSheffield would suggest further measures: Loicher Lane and Jumble Lane are narrow country lanes used as a &#8216;rat-run&#8217; between Ecclesfield and Thorpe Hesley, and we would suggest weight limits on this route of preferably 3 tonnes, or certainly 7.5 tonnes.</p>
<p>If these measures are insufficient for sightlines at the bottom of the ramp, we would suggest:</p>
<ul>
<li>a build-out in the road to the east (uphill) of the southern abutment with give way in favour of traffic travelling uphill. A solution frequently used by SCC elsewhere in Sheffield.</li>
<li>widening the footpath to the west of the southern abutment and creating a shared use path. This would require a fillet of land (approx 50m x 3m) acquired from Abbey Power Generation, currently a grassed slope with a stone wall that is collapsing into the footway in places.</li>
<li>Investigating acquiring land to the west of the northern abutment to create a new access ramp. This land is currently advertised as for sale.</li>
<li>Finally, and least preferred, closing the access ramp. Access at this point is obviously desirable, but alternatives are available and it is a relatively isolated spot. Retention of the bridge is far more important than access to the ramp.</li>
</ul>
<p>We find it ironic that access to a ramp to a cyclepath has become the main driver for the demolition of a bridge carrying that cyclepath and hence severely compromising the cyclepath&#8217;s coherence and safely.</p></blockquote>
<p>Sustrans, Railway Paths Ltd and Brian Dalton from Sheffield City Council are meeting on-site tomorrow to discuss the proposals. We will keep you updated with developments at Loicher Bridge.</p>
]]></content:encoded>
			<wfw:commentRss>https://backup.cyclesheffield.org.uk/?feed=rss2&#038;p=10802</wfw:commentRss>
		<slash:comments>2</slash:comments>
		</item>
	</channel>
</rss>
