All posts by Mick

Landfill, recreation and cycling routes

This week, the Council told CycleSheffield that there were concerns about methane seepage from the old Beighton Landfill site which is now part of Shirebrook Nature Reserve.  This problem had arisen because the original gas generator on the site was being replaced.  The old landfill site and the permissive cycle route across it could have been closed and there were concerns that the original cycle route around the reserve may have become overgrown.

The good news is that the gas generator has been fitted with no problem and the site is to stay open.  The other good news is that methane from the site has been tapped since the site was closed and capped off.  The gas-powered generator provides at least 1 MW of electricity to the National Grid.  CycleSheffield’s Sheffield FridayNightRide rode out there in 2010.

CycleSheffield also keep an eye on developments on Parkwood Springs and we know that dumping on this site is due to finish in 2016 and then it will be capped off. It is planned to capture the methane and have a gas generator at this site as well.  Parkwood Springs already has off-road cycling tracks, installed by SCC Parks and Countryside, which are popular.  There are plans for the landfill site itself to be left as green belt and have walking and cycling paths and routes.

CycleSheffield have asked if the Council knows if similar methane seepage problems may arise on Parkwood Springs and if there is a need to prevent something similar happening when landfill there ceases and gas extraction starts.  Our concern is that it could become a no-go area.  We have asked and we trust a response will be forthcoming.

https://www.sheffield.gov.uk/out–about/parks-woodlands–countryside/trees–woodlands/woodland-sites-and-projects/south-east-sheffield-woodlands-project/shire-brook-local-nature.html

http://www.sfnr.org.uk/past-sheffield-fridaynightrides/20100522-shirebrook-nature-reserve/

http://www.parkwood-springs.btck.co.uk/

 

rubbish access barriers at the Beighton Landfill Site
Access to the Landfill Site is through these carefully positioned barriers. These have been specially designed to keep off-road motorbikes away from the site.

Who has padlocked the gates at Virgin Active? What is going on with the Sheaf Valley Cycle Route?

Who has padlocked the gates at Broadfield Park Virgin Active?

What is going on with the Sheaf Valley Cycle Route?

CycleSheffield officers were phoned today (Friday 11 Oct)  by Sheffield City Council officers to see if they were responsible for some direct action.  Apparently someone had padlocked the internal gate in the yard of Virgin Active (VA) in Broadfield Park and it couldn’t be opened.  And it wasn’t a member of VA staff.  This branch of VA has recently left internal and rear service gates open so that its clients can drive in and out on Saxon Rd as well as Broadfield Park, and this has also allowed other drivers to use it as a rat run.

The Sheaf Valley Cycle Route runs up to and alongside VA.  Cyclists have to make a right turn onto a path or join oncoming traffic from the left.  Vehicles using the VA Saxon Rd gates cut across the Sheaf Valley Cycle Route in both directions and a Sheffield Council officer commuting to work has witnessed a cyclist being knocked off their bike by a car using the Saxon Rd entrance.

CycleSheffield has a vocal campaign to get the gates closed again because it is a hazard but the Council have been powerless so far and the manager, Phil Scott, of VA has no intention of closing them unless his head office says so or the Council direct him to do so, backed up by appropriate regulations or legislation.  When it was argued that he was negligent he refused to talk to cyclists and will now only talk with the Council.

CycleSheffield have stated that the padlocking was not their direct action but speculate that it may well be some disgruntled cyclist.  CycleSheffield does not renounce direct action but would always own up to it because publicity is one of the main aims of direct action. It has circulated details of the padlocking to its members but no-one has admitted to doing it.

The reason VA can leave the gates open is because VA never complied with its planning permission to put in bollards.  VA  put in a gate instead, and now allows all the gates to be open all the time.  Sheffield Council never ensured compliance and because over 10 years have elapsed, SCC can’t now enforce the planning regulations it set for VA in the first place.

The consequences of the failure to ensure compliance means that all the money and time Sheffield Council spent on designing the road layouts on Broadfield are wasted and all the money and time it spent on putting in the Sheaf Valley Cycle Route are not only wasted but the route itself is now knowingly hazardous.  Who is to blame?  Not the person who probably in exasperation has padlocked the gate but one’s ire should be directed at Virgin Active and Sheffield City Council.

———————————————————————————————————————————————————————————————————————

Please find below the email sent to SCC’s interim Head of Planning today.

 

To Maria Duffy

Interim Head of Planning

SCC

 

Dear Maria

Sheaf Valley Cycle Route

We are writing again as a matter of urgency about Virgin Active.   The manager of the VA premises has made it very clear to us that he will only talk and negotiate with the Council, which is why I am writing to you again today.

It has been brought to our attention today that someone, other than VA staff, has padlocked the internal gate at VA.  I can assure you that this direct action is not on CycleSheffield’s part.  CycleSheffield would internally authorise and publicly admit to any acts of direct action it took.

We did ask our members for a status report yesterday and all reports confirmed that the VA access gates on to Saxon Rd are left open everyday.  It was also confirmed that the route through VA is being used as a thoroughfare or highway.

We have your own officers reporting somebody being knocked off her bike by VA ‘induced’ traffic.  SYP were not involved because the person did not seek A&E help and, as far as we know, has not filed an incident report to complain about the driver.  But we have evidence, and no doubt, that the gates being open is a hazard.

We repeat, it seems that SCC:

  • need to discuss the situation with the CEO of VA , rather than the local manager;
  • has a moral argument.  VA has stuck to the spirit of the planning permission for over 10 years by ensuring that the internal gate was always closed.  It has only recently been opened.  So they have changed the use from previous custom and practice;
  • may also have a legal argument.  By opening the gates and allowing the traffic to use the car park as a thoroughfare by people other than their customers then VA has changed the use from solely a car park to also being a highway.  We find it hard to believe that somebody can just change the use from that of a car park to highway without some kind of permission.  It is not marked as a highway would be there are no Give Way signs etc – not that we want these but we want and need it closed.

We would expect our Council not to be craven and to use any means at its disposal to ensure that its intentions are upheld, i.e. the internal gate where the bollards would be is to remain shut unless it needs opening for service purposes.

 We asked to be informed of progress by the next Cycle Forum.  We think this matter is now urgent.  We would like to be updated on current actions and progress with this situation as soon as possible 

Regards,

Mick Nott

Chair, CycleSheffield

Membership: subs, benefits and where it all goes.

Thought I would put this up on the News blog before we get it ‘set’ into a page of its own somewhere

Membership is now (Aug 2014) approx 560 members and we had just under 250 at the end of 2012.

Having a large number of members is important for political clout and also the more members the more activists that may emerge.

500 was the target so that is a success but if we reach 700 we have the same per capita strength as the London Cycle Campaign

So pls get friends and colleagues to join too!

Below is member info: subs, benefits, and where it all goes

Membership Subs Sep 1 2014 – Aug 31 2015

Joining on-line or by post

Individual £6 Household £8 Concessions £4

 Membership offers

Affiliation to CycleSheffield for CTC members and Norton Wheelers

CycleSheffield is prepared to negotiate membership for cycling clubs or groups of cyclists such as bike user groups, enterprises and workplaces.

Individual £4 Household £5 Concessions £3

Contact us at membership@cyclesheffield.org.uk

 ‘Corporate’ membership

CycleSheffield is prepared to negotiate membership for entreprises that offer services or benefits to CycleSheffield or its members.  Please contact the membership secretary at membership@cyclesheffield.org.uk to discuss this.

 Current corporate members are Heeley Development Trust and the enterprises below who offer benefits/discounts to our members.

 Membership Benefits

Affiliation to CTC

CycleSheffield members can become affiliated members of the CTC.

Currently (Aug 2014) the affiliate sub is £16 pa

and you get a CTC affiliate card.

(Full CTC sub is £41 pa waged/£25 pa unwaged).

As a CTC affiliate member you get the CTC 3rd party liability insurance and access to all CTC on-line services and newsletters.

You don’t get access to the CTC legal services or the Cycle magazine.

We assume you get CTC discounts where those apply and on production of your CTC card.

To become an affiliate member of the CTC please contact membership@cyclesheffield.org.uk

(CycleShefffield recommends that all members get 3rd party liability insurance)

Local benefits/discounts

CycleSheffield does a monthly “bike shop run”.  This gives us a chance to talk about the health of cycling with bike businesses in Sheffield.  We have negotiated discounts from some businesses and plan to negotiate with others.  CycleSheffield is grateful for this support for our work through supporting our members.

Some businesses have good reason not to offer discounts so treat any discount as a welcome bonus.  A discount for CycleSheffield members does not mean we specifically endorse the business and we all have our favourites.  If you are an enterprise that would be willing to offer discounts to CycleSheffield members then please contact us at membership@cyclesheffield.org.uk

You will need to have your membership card to get a discount and at some bike shops its best to tell them before you get the servicing or purchase sorted out.

Amici & Bici (corner of Abbeydale Rd/Chippinghouse Rd): newly opened cafe/coffee shop with focus on cycling and cyclists. Offers 15% discount on production of CycleSheffield cards – nice food & coffee too!

Bike Rehab (Wellington St): offers a 10% discount to CycleSheffield members.

Giant Store (Queens Rd); offers a 10% discount to CycleSheffield members

JE James (All branches): offers a 10% discount to to CycleSheffield and CTC members

La Bicicleta (Greystones Rd): offers discount on services and always offers best price on bike purchase

Langsett Cycles (Langsett Rd): offers a 10% discount for Cycle Sheffield and CTC members.

Nourish (Pinstone St opp the  Peace Gdns) uses a bike for deliveries. Offers 10% discount to CycleSheffield members.

ReCycleBikes (Thirlwell Rd): offers a 10% discount for CycleSheffield members on servicing.

Russell’s Bike Shed (Bike Hub at Sheffield Station): offers £5 discount on any service (usually £35/£55) he does to CycleSheffield members.

and we still have to negotiate with

Evans: offer 10% for CTC members and will consider the same for CycleSheffield as we are affiliated to CTC – so tbc

and still to go are Bike Tree (Abbeydale Rd S, Dore), Tony Butterworth (Catchbar Lane, Hillsborough),.

AE Butterworth (Abbeydale Rd. opp The Broadfield): does not offer discounts as he works as cheaply as he can for all

Cycles in Motion (Harland Works, John St): does not offer discounts as he works as cheaply as he can for all.

Edinburgh Bike Coop (corner Broadfield Rd/Bedale Rd): have their own charitable causes and  are willing to donate to one-off events but don’t offer over-the-counter or on-line discounts to any group.

Halfords and Decathlon don’t do over the counter discounts – I think Halfords does 10% on all products and sale prices if you are in British Cycling.

Are there any other benefits for CycleSheffield members?

The main benefit is that your membership ensures cycling in Sheffield is  defended and improved.  We are working hard on this.  So you should feel good about belonging and supporting.

We are all members on the email list and that is the one forum where member speaks unto member.

CycleSheffield is affiliated to CycleNation, the national cycle campaigning group, and we give and take support and advice with other cycle campaign groups

CycleSheffield’s affiliation to the CTC means CycleSheffield events and rides, e.g Sheffield FridayNightRide and Polly’s women-only rides are insured by the CTC

What does your membership sub go towards?

Our subs are inexpensive and mostly go towards running the organisation, production of campaign, publicity and membership materials, and partially supporting members to go to cycle campaign meetings & conferences nationally and occasionally internationally

Out of your subs we pay for CycleSheffield’s subs to CTC, CycleNation etc, IT costs (eg subs for hosting websites, we also support the Twenty’s Plenty website for Sheffield), hire of meeting rooms, publicity materials (posters/banners/badges/cards/brochures etc), fairs and events costs, stationary and postage for membership, some kit (like our stall and a laptop for use at meetings), conference attendance and travel.

As officers we use our own ‘office kit’ and space, and phones, transport for CycleSheffield work.

Nobody is paid for working for CycleSheffield

We have built up a surplus which was enhanced by the CycleNation Conference we hosted in Nov 2011.

What do members do?

Each activist gives something – even if its just the sub – and we just need more activists giving as much as they feel they can each, whether its:

  • joining as a member – most important;
  • getting other people to join CycleSheffield;
  • reading the discussions on our email list/summary newsletter or fb page or our website;
  • contributing to the discussions on-line or at a meeting;
  • going to a CycleSheffield meeting;
  • staffing the stall at fairs/events;
  • running local campaigns, a very good example is what CycleSheffield members have done on monitoring Asline Rd, Sheaf Valley Cycle Route;
  • writing up meetings/policy/emails;
  • meeting officials/councillors/MPs;
  • researching and monitoring development plans/developments;
  • maintaining, editing and contributing to the website;
  • maintaining and developing our publicity strategy/materials;
  • maintaining and developing our membership db;
  • maintaining and monitoring our finances;
  • attending and participating at national and international meetings and conferences.

Any questions, amendments or queries about membership or your membership or affiliating to the CTC then pls get back to membership@cyclesheffield.org.uk

ALL this for

Subs Sep 1 2014 – Aug 31 2015 £6 individual; £8 household; £4 concessions

Astonishing!!!!

 

The Degradation of the Sheaf Valley Cycle: latest CycleSheffield response

The Council have been on the case with the Sheaf Valley Cycle Route. We received an email from Maria Duffy, who is Interim Head of Planning, of how they saw the situation and what they felt they could do.

We have responded assertively and argue that:

  • cycle access to Heeley Retail Park should be restored;
  • the situation with the access gates on VA is hazardous and compromises both the cycle route and the traffic flow in and around Broadfield as it has become a rat-run;
  • the officer who assessed the situation didn’t understand what he was looking at;
  • we expect the planned number of parking places as specified in U-Mix’s planning permission will be in place

In addition we have argued that planning officers:

  • should not trust developers to comply with planning permissions
  • have wasted money and compromised traffic flow by not ensuring compliance with planning permissions;
  • do not understand the difference between a road, path, lane and understand that a route may comprise all three;
  • would be better off consulting with cyclists when collecting evidence.

Lastly we have argued that we are not impressed by telling us that many Council officers cycle so understand our point of view.  We have said we will believe that when we see evidence of it in their work.

Full detailed reply below.

==========================================================================================

To Maria Duffy

Interim Head of Planning

SCC

Dear Maria

Sheaf Valley Cycle Route

We have now considered your email of 20 Sep in response to our email of 2 Sep 2013  addressed to Richard Skelton. Congratulations on your appointment as Interim Head of Planning. I trust you are finding the post congenial. We thank you for the detail of your reply and we in turn are as detailed.  The devil is in the detail.

CycleSheffield has recently scouted the Sheaf Valley Cycle Route to corroborate what our members have been telling us.  We note what you said about the line of the route of the cycle path in the Heeley Retail Park.  The main point is that SCC will negotiate with the land-owner and accept that the main option is “the replacement of the steps with a ramp and reinstatement of the approved cycle route, sufficiently clear of Costa customers.”  We are pleased that this is so, although we worry about what the minor options could be.  We expect to hear what progress has been made, say, at the next CycleForum.

We wish to stress that ‘trunk’ cycle routes are important but are also pretty useless without ‘branches’ that are clearly signed and designed to connect to where people live, work and shop.  It would strike us that what Heeley Retail park is doing is closing down cycle access to their retail units.  We trust that SCC does not want to encourage or allow this kind of attitude or behaviour from developers.  Simon Geller has received an email from an officer suggesting an alternative link to Meersbrook via Little London Place that avoids entering Heeley Retail Park.  This suggestion does not negate the need for cycle access to the Retails Park via the path from Little London Road.  What it does do is take the connection to Meersbrook out of the Retail Park.  This is a helpful suggestion.  We will soon have a Cycle Schemes Sub-Committee as part of the Cycle Forum and this suggestion could be brought to and explained to this sub-committee, which in turn would report to the Cycle Forum.

With respect to planning in Sheffield we think the lessons are that

  • all new developments (whatever their purpose) should have, as part of their planning requirements/conditions, good quality cycle access, cycle parking and links to cycle trunk routes.
  • schemes for the development or alteration of cycle routes now has a formal forum to which we would expect officers to bring ideas, plans, TROs and so on.

We dispute your argument about the cycle route.  We think you and your officers have concentrated on the path, and ignored the designated route.  The cycle route is on a roughly north-south line along the road on Saxon Rd and is continuous with a shared-use path beside Virgin Active.  We are talking about a route which consists of a shared-use path and a road at the location in question.  Your argument misrepresents the situation.

Let’s be clear: travelling along the Sheaf Valley Cycle Route from the North to the South a cyclist leaves Saxon Rd by making a right turn, across oncoming traffic from the WNW direction on Saxon Rd, to continue on the route onto the shared-use path.  There is a ‘fillet’ of a cycle lane in the middle of Saxon Rd at this point to help cyclists with this manouevre and to flag to motorists that cyclists will be in the middle of the road.  Travelling from the South on the Sheaf Valley Cycle Route a cyclist leaves the path beside Virgin Active and has to join the traffic coming from the left in the WNW direction to continue on the route on Saxon Rd.

Now that VA has opened its access gates for access with Saxon Rd then vehicles leaving VA to turn left onto Saxon Rd will either come into conflict with north-travelling cyclists turning right, or south-travelling cyclists joining Saxon Rd traffic from the left. If the vehicles leaving VA join Saxon Rd to go North then there is not a conflict with the cyclists on the route.

Vehicles entering VA from the North from Saxon Rd may conflict with cyclists travelling South and cyclists travelling South waiting to turn right may block the field of view of oncoming traffic on Saxon Rd for these drivers.  Vehicles entering VA from the WNW direction on Saxon Rd may come into conflict with cyclists exiting the path to continue onto Saxon Rd.

This is represented on a map for your and your officers perusal at http://goo.gl/maps/nwlau.  The point is that this car traffic has increased traffic flow on Saxon Rd, created rat-runs that SCC did not want, drivers entering or leaving VA will be on to this junction before they are ready as there are no give way lines or signs within VA that it is a junction at which they have to Give Way or a hazard is present.

We think these are all unnecessary hazards and would be avoided if VA stuck with sole access via Broadfield Court which was the intention of the original planning permission. 

We note that VA did not comply with its original planning permission.  It installed an internal gate instead of bollards and now it opens both its internal gate and its rear access gate with the intention of providing ease of access and convenience to its customers.  We surveyed VA the other night for approximately 5 minutes where we could see rear gates and front entrance.  We noted two vehicles use it as a rat-run to make a journey from Heeley to Broadfield and a CycleSheffield member has had it confirmed by his neighbours that they use it as a rat-run too.  VA’s actions are confounding the Council’s attempts to control the flow of traffic in this neighbourhood.

We would be willing to go with the officer who reported back to you to the location so he can listen to experienced cyclists to ensure that s/he understood the difference between a route, a path and a road.

You say, “Officers have investigated the planning permission for Virgin Active and the approved plans show a line of bollards across the access at the side of the building which would have prevented vehicles accessing the front.  Unfortunately, Virgin did not put the bollards in place and this has only very recently come to light because until a short time ago, the existing gates were kept shut allowing access for service traffic only.

Virgin have now been operating for more than 10 years and, unfortunately, planning legislation does not allow the Council to take any enforcement action to force Virgin to put the bollards in place.  We will however write to Virgin Active, pointing out the hazard and seeking their agreement to restrict the use of the gates for servicing.”

One of our members has written to VA and we received a surly, curt response and notification that they will only deal with the Council.  We trust you have more luck than we did.  It seems to us that this may be an issue you need to approach the CEO of VA about.  But it does seem to us that you have a moral argument.  VA stuck to the spirit of the planning permission by ensuring that the internal gate was always closed.  It may also be a legal argument of something like custom and practice and we would expect our Council not to be craven and to use any means at its disposal to ensure that its intentions are upheld. i.e. the internal gate where the bollards would be is to remain shut unless it needs opening for service purposes. Please let us know of your progress on this matter by, say, the next Cycle Forum.

Lastly we want to express our weary disappointment that nobody seems to ensure that developers comply with planning regs.  For a development of this size, think how much could have been saved by a visit early on to ensure the bollards were in place.  For the lack of a small amount of time enforcing compliance the Council is now left with both a flagship cycle route and expensive plans and developments of traffic flow in the neighbourhood compromised.  As you say VA has been there over 10 years so the reason for lack of enforcement can’t be shortage of staff brought on by Government cuts.  We think they are the result of poor, if not incompetent,  management and monitoring of developments.  Officers should be ashamed at this waste of money and degradation of facilities.

If you want more evidence of rat-running through VA and you are short of staff then we could discuss collecting it ourselves.

With respect to planning in Sheffield we think the lessons are these:

  • do not trust developers to comply with planning permissions.  Compliance is an essential part of the planning process too and compliance must be actively monitored by officers and if necessary enforcement must be done.
  • ensure when discussing items like cycle routes that officers take the time to know and understand that words like path, road, lane all have different and complementary meanings and routes are most often combinations of all three of these elements.
  • officers whose expertise may not be in cycling or understanding cyclists’ perspectives should consult with cyclists to check on what they are reporting.

We note what you say about the alternative parking provided for U-Mix.  We are delighted that this is being used and it is clearly signed.  The original planning permission was specific about the number of parkings spaces that should be available.  I think we would like confirmation that this number is now in place.  Please let us know of your progress on this matter by, say, the next Cycle Forum.

We note that you say, “There are full parking restrictions along Asline Road in the form of double yellow lines and there is also an issue of enforcing these restrictions separate from the planning issues.  We will be exploring the possibility of better enforcement of the parking restrictions.”  We have met the police commissioner about cycling matters in general and as a result we are meeting with a Superintendent in Sheffield to discuss cycling matters. The police directing football coaches to park on the Asline Rd cycle path will be one of those matters.  We will be providing feedback at the next CycleForum  Please let us know of your progress on this matter by, say, the next Cycle Forum.

We thank you for detailing who is looking after this case and we trust you share this correspondence with them.  We note that you say, “ …a number of my planning and highway officers use the Sheaf Valley Cycle route themselves on their cycle commute to and from work and that gives them a good understanding of the problems you have identified.”  That may well be but until the responsible officers: put cycling higher up the planning agenda; read, internalise and enact Council policy and action plans; consult with cyclists as they ought to; train themselves to do cycle audits, as they should have started to do in 2006; then we do not see how their personal cycling experience informs the quality of their work.

With respect to planning in Sheffield we think the lesson is one’s personal experience and attitude does not necessarily match one’s professional experience and attitude. Don’t confuse the two.

 We would find it helpful to meet with you and John Bann the Head of Transport ,Traffic and Parking Services to discuss matters in general and perhaps we can look at arranging a meeting after the next CycleForum where we can assess progress made and knock some ideas about.

Regards,

Mick Nott

Chair, CycleSheffield

 

 

Meeting the South Yorkshire Police & Crime Commissioner (SYPCC)

Meeting the South Yorkshire Police & Crime Commissioner (SYPCC)

Report from Mick Nott

I, with my CycleSheffield Chair hat on, went to a surgery appt with the SYPCC (http://www.southyorkshire-pcc.gov.uk/Home.aspx) on Friday 14 September.

I met with the PCC, Shaun Wright and his PA, Tracy Webster.

We had already flagged our concerns in an earlier email, which is towards the end of this post.

Outcomes of the meeting

I think the PCC has agreed to take our concerns to discuss with a senior officer or officers and he is to suggest that SYP meet with us to discuss cycling matters in general.

CycleSheffield’s hope is that we can become engaged with SYP in a positive and progressive manner on matters to do with cycling in Sheffield.

We feel at present there is no coherence if we try to deal with general matters through particular incidents with separate officers.

CycleSheffield is concerned about

  • police advice wrt reporting of harassment of cyclists that has dismissive responses from some police officers

  • police abuse of cycle facilities (which I know has been addressed but the example we provide does stick out a mile)

  • police advice on road developments which we think show out of date attitudes towards how users should share roads and lack of specific training

  • police responses (as reported in the press) to hit and runs which stresses what the victims should do and not concentrating on what the perpetrators of these crimes should do

and we made a plea for SYP to take a systematic interest in the Council’s CycleForum so they can attend if needs be and certainly keep abreast of what issues are current.  And SYP could even add their own issues & concerns.

The meeting was cordial; both Shaun and Tracy were attentive to our points and sympathetic with our concerns.

I am confident that CycleSheffield will be able to develop this initiative.

Mick

Chair, CycleSheffield

———- Forwarded message ———-

From: Mick Nott

Date: 23 May 2013 15:20

Subject: Re: Issues to do with cycling – Request for Surgery Appointment (1094)

To: Dinah Tindall

Dear Ms Tindall

Thanks for getting back to me and apologies for the delay in my response.

I was taking some time to consult members of CycleSheffield

The reason for the appointment is to discuss SYP and its policies and attitudes to cycling and cyclists.

Here are some examples:

Police attitudes to harassment of cyclists: We have talked with officers from Safer Neighbourhood teams and their advice is to to report incidents where cyclists are harassed on the road including near misses using the 101 number.  However our experience is that the consequent responses from PCs who pick up these reports are dismissive.  We understand that 101 data is aggregated and used by SNT to identify issues to target so we are confused by encouraging advice and discouraging responses.

Police attitudes to cycle facilities: We have reported to local police obstruction of a segregated cycle path on Asline Rd and police officers have promised to get back to the cyclists making the reports on consequent actions or follow-up.  This has not happened.  In addition police officers direct football coaches to park on this segregated cycle path when SUFC are at home.  We think this just encourages others to use the cycle path as a car park.  We have asked SUFC about this and they say they have forwarded our emails to the police who, in turn, have told SUFC they are following this issue up with the Council.  Nobody in the Council seems to know about this police initiative.  Nobody has got back to us even though our emails contain our contact details.

Another example where we had more success was our reports via 101 about police vans parking in the contraflow cycle lane on Castle St opposite the Snig Hill police station.  A police sergeant did get back to us about this and she did instruct officers not to do it.  However officers carried on doing it and our photos of these incidents, reported on a blog, made the Star.  Since their publication the obstructive parking by police on this cycle lane has stopped.

Police advice on road design:  The junction of Minna Rd (side road) with Burngreave Rd (main road) has recently been redesigned.  The police comments were: We believe that the inclusion of a short section of cycle lane across the mouth of the junction which ends at the rear of the bus stop, could result in cyclists coming into conflict with vehicles as they pull out to re-join traffic.  I believe the thinking behind this short section which does not join any existing facility was to make it safer for cyclist to cross the junction, but as you are closing the junction down and taking out the slip road, I believe this already reduces any existing risk there was to pedal cyclists, and there does not appear to have been any incidents in this area to justify this.

We ask you to note that the officer writing this believes that cyclists (on the main road) will come into conflict with vehicles (coming out of the main side road).  We think the premiss of the situation is that cyclists on the main road have right of way and drivers of vehicles coming out of the side road are obliged to give way to all traffic on the main road, i.e. vehicles come into conflict with cyclists.  Our advice was contrary to the officer’s as we believe that a cycle lane would provide some infrastructural support for cyclists cycling up hill whilst having to negotiate a route with traffic both overtaking and waiting to come across the give way lines.

Police not participating in democratic meetings: Sheffield City Council has a Cycle Forum, which is seen by the Council as the place where substantive issues of policy and practice, to do with cycling in Sheffield, can be openly discussed and progressed.  The police have a standing invitation to this Forum but generally do not attend.  Their advice and participation would be welcome.

Police response to hit and run:  We are concerned at the reports of police officers’ advice to pedestrians (and we presume cyclists) to wear bright, reflective (eg hi-viz) clothing to avoid collisions with vehicles.  Our concern is that the stress is all on what the victim of a hit and run collision needs to do to avoid being hit by unsafe and negligent drivers.  See http://www.greatgasbeetle.com/south-yorkshire-police-a-new-low-in-keeping-pedestrians-safe/

When we have spoken to the police we get responses from individual officers, but promised follow-up does not materialise and we think some of the advice issued or offered by police officers doesn’t acknowledge best practice or training in what cycling experts say.  We think SYP lacks of any coherent, coordinated view on cycling and maybe has not given this point any attention.

We would value discussing this point with SYP – but it is not a specific incident and no officer will take it further, unless it has an incident number.

(Although we have incident numbers and dates to support much of what we have written above)

Therefore we would like to meet with the Police Commissioner to discuss our concerns and whether he is able to help us make progress with engaging with SYP.

Yours sincerely etc

Agenda and some notes for CycleSheffield Meeting Monday 2 Sep 2013

Agenda & notes  for CycleSheffield meeting

Monday 2 September 2013

at the Heeley Development Trust, Ash Tree Yard, 62-68 Thirlwell Rd, S8 9TF.

Start 7.30 pm Close 9.00 pm

(Follow the Sheaf Valley Cycle Route to Saxon Rd/Chesterfield Rd, Turn L then turn R into Thirlwell Rd by the Red Lion map)

Cycle stands in the yard

Tea and coffee available

All welcome

  1. Apologies

  2. Minutes of last meeting

  3. Financial Report and Budgeting HH (do we need this?)

  4. Feedback from Cycle Forum and next Cycle Forum: AR/MN

  5. Campaigns and Campaign Policy SG

    1. City Centre Master Plan MT

    2. Taxi driver behaviour MN

    3. Making one way streets contraflow – likely candidates. MT

    4. Twenty’s Plenty/Active Travel  RA

    5. Streets Ahead – update on progress, MN

    6. Bikes & Trams

      1. On-going campaign PB

      2. Tram-Train PB

      3. Track relaying MT

      4. Future extensions SG

    7. City Issues

      1. Asline Rd MN

      2. Any other correspondence

  6. Membership progress and numbers, and Membership benefits & communications MN/TC

  7. TdF 2014 update – MN

  8. Chair’s business – Scrutiny Committee, Sheaf Valley Cycle Route, Claywheels Lane etc

  9. Programme of CycleSheffield meetings and socials

  10. AoB

  11. Date of next meeting

https://docs.google.com/document/d/1Sf4IZVewoWYrlx_jV5gGX6F-CzezSzc-8j8NuRmRYGU/edit

CycleNation/CTC/Leeds Cycle Campaign National Conference

This conference is a chance for cycle campaigners from across the country to meet up and talk about what they’re doing and what works for them.
(We hosted it in Sheffield in 2011)
Programme and booking details for this conference are here
It is on Saturday 5 Oct
10:00 start 5:00 pm finish

There are social events on the Friday and Saturday evening and two rides on the Sunday
Simon & Mick are going and cycling up on the Friday.
CycleSheffield can sponsor up to two additional members  to go to this.
We will pay your conference fee (includes lunch) plus travel
- if you want to stay you would have to pay your own accommodation.
(Cheap rooms at Travelodge- also possible to get the train back to Sheffield after the social events)
 You would be asked to give a written report to CycleSheffield on the value of the conference.
If you’re interested get in touch with Simon at simonmichaelgeller@gmail.com

CycleSheffield membership, data, cards, benefits, and what we do with it all

What has been going on with membership?
Its been a lot of work and time to get the paper records onto an electronic database and tidy up our membership db – thanks to Matthew for building the db and transferring the old paper data and entering new data and now thanks to Tony for working on the database tables, forms, reports, queries and entering data for repeat subs.
I’ve been trying to get on top of the work of entering the data from the on-line form.  
We are still repairing holes!
BUT we think we may have bottomed out the work and we should be able to build up from now and have some reasonable faith that everybody who should be on the subs list is on the subs list.
(Please be tolerant; don’t forget we do this in our spare time)
We have approx 280 members incl all household members.
 
How do you know you are a member?
We spent a day printing and envelope stuffing, sticking and stamping this week and we think we have sent everybody on the db the membership cards they are entitled to, with name, membership number & the expiry date clearly printed on them. 
Every individual and household member should have got a card
Hope you have got them OK.
If there are ever changes in your contact details or circumstances then let us know.
We should soon be able to automatically send reminders by email to let you know when your sub(s) are due.
We prefer it if you pay by standing order but you may pay by PayPal.  (As we grow we may be able to set up direct debits but that is a way off).
We don’t like repeat payments by cheques (too much admin) or cash (too insecure).
We have been taking cash subs from first time subscribers at fairs and events where we can account for the dosh!
 
Are there any benefits for CycleSheffield members?
The main benefit is that cycling in Sheffield should be defended and improved.  We are working hard on this.
We are all members on the email list.
CycleSheffield is affiliated to CycleNation, the national cycle campaigning group, and we give and take support and advice with other cycle campaign groups
CycleSheffield is affiliated to the CTC and this means CycleSheffield events and rides, e.g Sheffield FridayNightRide and Polly’s women-only rides are insured by the CTC
Our members can become affiliated members of the CTC.  At the moment the cost is £16 pa and you get a CTC affiliate card. (Full CTC sub is £41 pa waged/£25 pa unwaged).  
As a CTC affiliate member you get the CTC 3rd party liability insurance and access to all CTC on-line services and newsletters.   You don’t get access to the CTC legal services or the Cycle magazine. I assume you get CTC discounts where those apply.
We are in the process of negotiating discounts locally for CycleSheffield members (on production of your card) with bike businesses and cafes.  
We should have a list ready for beginning of September.
 
What do members do?

Each activist gives something – even if its just the sub – and we just need more activists giving as much as they feel they can each, whether its:

  • joining as a member – most important;

  • getting other people to join CycleSheffield;

  • reading the discussions on our email list/summary newsletter or fb page or our website;

  • contributing to the discussions on-line or at a meeting;

  • going to a CycleSheffield meeting;

  • staffing the stall at fairs/event;

  • running local campaigns, a very good example is what CycleSheffield members have done on monitoring Asline Rd;

  • writing up meetings/policy/emails;

  • meeting officials/councillors/MPs;

  • researching and monitoring development plans/developments;

  • maintaining, editing and contributing to the website;

  • maintaining and developing our publicity strategy/materials;

  • maintaining and developing our membership db;

  • maintaining and monitoring our finances;

  • attending and participating at national and international meetings and conferences.

We need as many activists as we can to do a (their) bit.

New ‘class’ of membership
We are delighted to announce that from Sep 2013 we have a corporate member, Heeley Development Trust.
HDT will be providing some services for CycleSheffield and in return we have negotiated a number of CycleSheffield memberships for them to allocate amongst their workforce.
If you know of any other enterprise or group that may be interested in corporate membership please let us know and we can negotiate something with them.
 
What does your membership sub go towards?
Our subs are inexpensive and mostly go towards running the infrastructure and partially supporting members to go to cycle campaign meetings & conferences nationally and occasionally internationally
Out of your subs we pay for CycleSheffield’s subs to CTC, CycleNation etc, IT costs (eg subs for hosting websites, we also support the Twenty’s Plenty website for Sheffield), hire of meeting rooms, publicity materials (posters/banners/badges/cards/brochures etc), fairs and events costs, stationary and postage for membership, some kit (like our stall and a laptop for use at meetings), conference attendance and travel.
As officers we use our own ‘office kit’ and space, and phones, for CycleSheffield work.
Nobody is paid for working for CycleSheffield
We have built up a surplus which was enhanced by the CycleNation Conference we hosted in Nov 2011.  
I hope to get all this detail plainly set out on our website over the next 3 months.
 
Any questions, amendments or queries about membership or your membership or affiliating to the CTC then pls get back to me mick.nott@googlemail.com
 
ALL this for 
Subs Sep 1 2013 – Aug 31 2014 £6 individual; £8 household; £4 concessions
Astonishing!!!!
Mick, Chair & Membership Secretary

What is your initial advice to the Scrutiny Committee's inquiry into cycling?

Hi Folks

Preparatory meetings for the Scrutiny Committee on cycling start next week.
This inquiry is a result of the campaigning work done by CycleSheffield.
I’ve summarised what is going on below the dashed lines.
I need help and advice.
My thoughts are these: 
  • there needs to be background briefing for councillors on the committee on the economic, environmental and health and wellbeing impact of cycling eg evidence from growth of bike shops and people in the bike business in Sheffield, Cycle to Health, personal examples from people who cycle as well as the evidence from national sources like CTC, Sustrans - more examples please
  • the cllrs are keen to determine what has been effective in Sheffield wrt cycling, eg cycle training for school students and Sheffield residents and workers, Bike Boost and bike loan schemes, examples of some of the cycling infrastructure on roads, mountain bike trail at Parkwood Springs - more examples please
 Then the cttee need to frame item 2 and 3 in the terms of reference – the floor is open to yourselves, what should they be?
 And the report will need a name, cllrs are keen to get this sorted soon. Birmingham City Council have done a similar scrutiny last year and it was called Changing Gear.
 Got any name suggestions for a final report? eg “We have nothing to lose but our chains”?
 
I’ll leave it there for the moment. The next stage will be framing the questions that match the terms of reference.
 So get back to me on this website to me personally (my email is at the end).
 
Thanks
 
===========================================================================================================
  • SCC’s Scrutiny Committee for Environment and Economic Well-Being  will inquire into cycling in Sheffield from August 2013 until March 2014.

  • A Scrutiny Committee is the local government equivalent to a Parliamentary Select Committee and this inquiry has the support of all the elected parties in Sheffield.

  • Scrutiny Committees have the power to request evidence from stakeholders outside and inside SCC.

  • The committee will take written and oral evidence from stakeholders with an interest in cycling in Sheffield as well as seek advice from interested parties outside Sheffield.

  • The committee would consider and evaluate the evidence and produce a report.

Initial thoughts are the committee’s final report would aim to:

  1. identify effective current effective practice in Sheffield wrt cycling;
  2. make recommendations for the effective development of cycling in Sheffield;
  3. make recommendations for an effective process of consultation about, and monitoring of, developments wrt cycling with cyclists.

So these could be the Committee’s Terms of Reference

Meantime current developments and developments wrt cycling, e.g. introduction of cycle audits, appointment of an officer with responsibility for cycling, will proceed.  This scrutiny is not a delaying tactic and present developments in cycling should not be blighted.

Mick Nott, current Chair of CycleSheffield will be co-opted to collaborate as an adviser, alongside SCC staff, to the committee.

It is proposed that the advisor would consult with cycling groups and other stakeholders and advise the committee with:

  • the scope the depth and breadth of the scrutiny (and giving it a name!);
  • framing the scrutiny’s terms of reference;
  • preparing briefings for committee members and identifying a range of stakeholders to give evidence;
  • advising committee members before and during the taking of evidence;
  • helping with the collation of evidence and advising during the writing of the report.

The final report would be agreed by the committee.

The recommendations in the final report would be considered by the cabinet of SCC’s  Council.

For more details and/or advice please contact

Mick Nott

Chair, CycleSheffield

mick.nott@googlemail.com

www.cyclesheffield.org.uk