All posts by wildnorthlands

Streets Ahead Cycling Improvements

Over the next few weeks and months you will see a number of small improvements to cycling in Sheffield, brought forward by the Streets Ahead Cycling Opportunities programme.

This week Amey are on site converting the city-side pavement to shared use alongside the Inner Ring Road between Broomspring Lane and Broomhall Rd, giving us cycle routes along both sides of this busy road. Eventually we would like to see parallel bike routes on both sides all the way round the Inner Ring and improvements to the existing route.

Another example of the sort of scheme that is going in is the kerb dropping at Clough Rd, where the Sheaf Valley Walk emerges from Granville Square, lopping off a few hundred yards of dog-leg from the Sheaf Valley Cycle Route.

There are over 60 small schemes like these in the pipeline – small changes that will make a big difference to cycling in Sheffield as well as some big schemes like Penistone Rd and Meadowhead. We will keep you posted on these and if you are a member you can join in the consultations on the schemes as they come up.

Peak Cycle Links – Work begins!

Peak Cycle Links sent us this:-

We have good news. Nearly 3 years ago we obtained planning permission for a cycle trail following the old railway line from Ladmanlow in Buxton, and over Staker Hill. There were several planning conditions which had to be satisfied – and now they have been, thanks largely to the Project Manager appointed by Derbyshire County Council to oversee the whole project.

To confirm planning permission we need to commence work on or before Friday 14th February. The location for ‘commencement of works’ is to be the Old Tramway which runs parallel with Ladmanlow Road in Buxton between the driveway to the Grin Low Country Park car park and caravan site and the junction of Ladmanlow Road and Leek Road. We are looking for volunteers to help take down a 4 metre section of dry stone walling and remove a number of trees and saplings. The County Ranger Service will undertake the tree work and will supervise all demolition work.
This will be done on Wednesday 12th February starting at 10am (tbc).
Please spread the word and turn out if you can, even if only for a few hours. Thanks!

Sheaf Valley update

A CycleSheffield member recently noticed that coaches were parked on the Asline Rd cycle track and asked South Yorks to ticket them. She got this response:

 

Tweet captured from SY Police

We were flabbergasted at this. So ensuring safety involved forcing cyclists either onto the pavement or into the pah of vehicles on the adjacent one-way road? CycleSheffield Chair Mick Nott burst into action and wrote to David Caulfield Head of Planning and Regeneration at SCC and also the SCC Cycle Champion, copying in South Yorks Police and Sheffield United as well as the council’s  cycling officer, making the following points:

  • This cycle path is an essential link on the Sheaf Valley Cycle Route
  • This cycle path is also used as a coach park by SUFC.
  • Whilst its a coach park for all SUFC home fixtures there are no signed alternatives for cyclists and the SYP do not provide any.

We had already been engaged with this problem. Astonishingly, the cycle track appears to have been designed with a view to allowing coaches to park on it, with tapered kerbs and there is a cycle route sign which has been designed to withstand occasional collisions with a coach. 

There appears to be no Traffic Regulation Order allowing the parking of coaches on this cycle track and no signs are posted advising cyclists that vehicles may be parked on it.

So we will be expecting  firm action from the Council and the Police to stop this abuse of the facility.

Elsewhere on the Sheaf Valley route there is better news. Kerbs have been dropped at Sheaf Valley Gardens to remove an awkward  dogleg on the route. Costa have put in an application to build a cycle track outside their outlet at Heeley Retail Park, and the rear gates at Virgin Active have been kept locked except on one occasion when there was severe congestion on Broadfield Road – the manager felt obliged to notify tthe council that he had done this, so our campaign clearly struck a nerve with him.

We will continue to monitor this route, as with all the bike routes and roads in Sheffield and take action where necessary.

 

 

 

 

 

 

 

 

 

Space for Cycling meets in Sheffield #space4cycling

Cycle campaign groups from across the country are meeting in Sheffield on Saturday the 25th to progress the Space for Cycling campaign #space4cycling

This national initiative aims to raise the profile of cycling in the run-up to the 2015 elections, and through to the 2016 national elections. Candidates will be asked to sign up the Space for Cycling  

The local press have just run an in depth story about cycling in Sheffield “Making our streets safer for travel on two wheels”

http://www.thestar.co.uk/features/making-our-streets-safer-for-travel-on-two-wheels-1-6378960

 

 

 

 

Sheffield on the Move (not)

We went to Sheffield on the Move last night, where trialling bikes on the Tram-Train to Rotherham was discussed.

A gentleman from the PTE spoke first, giving us the background  – they have produced a questionnaire that has been circulated to special interest groups asking us some questions about who we think should be given priority. Unsurprisingly, being reasonable people, both the access for all group and ourselves had come to the same conclusions on this.

Our Polly gave  a very reasoned talk on why we felt bikes should be included in the trial. (A very different thing from saying that bikes should be carried on the service, or indeed any tram service) including evidence from the many countries where this works.

We then had a rather pompous speaker from the Today’s Railways who knew a lot about the Manchester Metrolink  but not much about Supertram and didn’t help his cause by attacking a disabled woman with a brain injury for wearing a helmet. That disabled person Caroline Waugh, gave a spirited account of how she is discriminated against by being refused access to trains and trams because she chooses to use a human-powered mobility device rather than a motorised one.  Clearly the existence of disabled cyclists has thrown those who wish to invent a conflict between disabled people and cyclists into disarray.

The outcome I think was that the forum endorsed the principle that bikes should be included in the trial. However, Stagecoach has yet to agree. I seems to me that they had better if they wish to be considered
The following item was about the £8m cuts that the PTE are going to have to make. Rather than make the tough decisions themselves, however, they want us to decide so they can deflect the blame. Ian Jenkinson, manager of Sheffield Community Transport made a strong case for protecting the most vulnerable in the community. I completely agree with IJ that vulnerable people should receive priority when to comes to “Subsidy” (some call it investment) and think there is a case for arguing for example that kids could cycle to school if the roads were made safe for them. Something to think on.
I didn’t get to pick up the SYPTE questionnaire – but we should have a look at it. (I had to help Caroline get back to Dore on the train which all went well – no thanks to the lack of assistance from CycleSheffield and CTC members to whom an appeal for help & moral support went out.) However Dave Holladay had called Northern Customer Assistance and a very nice gentleman called Paul was there to help out – Caroline has his details, could be a useful contact in future. There were 3 bikes on the train already so 6 including the trike and my Brommie, all fitted on fine – on a vehicle which is much smaller than a Supertram. Caroline showed me her route home which is crafty – we will have to incorporate it into a ride sometime. I digress)

20131017_191702 20131017_173124 20131017_173057 20131017_190728 20131017_190716

 

 

 

 

Save the Bus Lane – the outcome

The Highways Committee discussed the proposal to remove bus lanes on 10th October and decided to go with the recommendations from Place. These can be summarised as follows:

Part of the Bus Lane at Banner Cross will go.

The Hunters Bar – Rustlings Rd bus lane will go, but not until there is an alternative cycle route through Endcliffe Park.

The Shared Use proposal for the pavement on Ecclesall Rd is being dropped –  a victory for common sense.

Our suggestions for improvements to cycling on adjacent streets are being considered.

So, a partial victory for us, and the principle we hope that you can’t just take out bus lanes without considering cyclists. We don’t particularly want to share space with buses but at the moment it’s all we have in many locations.

The Smart Routes project we hope will provide a better environment for all users of Ecclesall Rd overall.

http://www.smartroutes.co.uk/ecclesallroad/

http://www.cyclesheffield.org.uk/coreprinciples/ecclesall-rd-smartroutes-consultation/

A small victory in Frecheville

Mosborough was one of the first areas of Sheffield to get the Streets Ahead treatment. We got out to take a look at the area and one of the comments we made was that the bike lanes put through the pedestrian islands were too narrow. Here’s what the new ones look like:

20131012_124223

The lanes are advisory – some vehicles would have to drive in them to get past  – but they do provide a decent amount of space for cycling, and hopefully would deter drivers from squeezing past a cyclist.