All posts by wildnorthlands

Uni Concourse Ramp now open

The new ramp between the Concourse and Durham Road is now open, with a lot more room for pedestrians and cyclists.

Uni concourse
Uni concourse
University of Sheffield has plans for more campus refurbishment, using the Heart of the City project as a benchmark. The dangerous pedestrian crossing at Brook Hill is due to be replaced with a “super-crossing” further up, near the Arts Tower car park exit (the car park itself will go once the multi-storey on Durham road is built) and work is going on to re-model Brook Hill roundabout. We don’t know the timescales for any of this yet though.
Meanwhile, some work has been done on Glossop Rd and bits of the cycle lane  have been repainted (only the bits that were dug up of course)
road works on glossop rd

Changes to how we run campaigns

At this year’s AGM we appointed a Campaigns Manager.

Having given it some thought as to how to approach this, he’s tried to apply Project Manager techniques to the task and created some templates in Google Docs.

So we now have a Campaigns Initiation Document for any new Projects. These have been looked at by the exec group and approved for use at last night’s meeting.

This is is an example of how this will work, based on the Ecclesall Rd campaign. 

We also have  also written a Campaigning Policy to which we would expect anyone running a campaign on our behalf to abide by.

Anyone running a campaign will be expected to provide a brief monthly update to meetings.

Something else we propose is be an online form so members can suggest prospective campaigns to us.

We now intend to inform the council that this is how we intend to work in future.

Cycle Route Blocked by Costa

Costa have set up shop in Heeley Retail Park and blocked the cycle route. Where the ramp used to be there are some steps and to cycle through you have negotiate your way through the tables and then do a dog-leg to get the to the dropped kerb. There has certainly been no consultation about this!

 What with this and the re-opening of the rear access gate to the Virgin Gym which has massively increased rat-running in the area , the fact that nearly all the signs on the route are pointing in the wrong direction and poor maintenance of the off-road sections, the Sheaf Valley route is becoming eroded away to the point of becoming unusable.

20130828_095905 20130828_095959

 

Government announcement on cycling – what Sheffield & the Peak get out of it.

These are the works that are being funded in the joint bid that Sheffield put in with the Peak District.

Connection from Beeley Wood into Wharncliffe Woods – including an intervention (to be decided) to get across the railway

Some surface improvements in Wharncliffe Woods

A new cycle route from Wharncliffe Woods through Deepcar, Stocksbridge and Langsett connecting to the TPT at Thurlstone Moor (and crossing the 2014TdF route)

Surface improvements on the approach to Dunford Bridge

The estimated cost is £1.7Million, of which the grant awarded today will contribute £1.1million

Note that Cyclesheffield members have lobbied hard for this, in particular the safety improvements at Oughtibridge.
Also in the bid

Creation of a number of other new routes including

connecting the Monsal Trail into Buxton and Matlock and connecting to existing trails

A route from Staffordshire

A route through the Hope valley (though at partner discussions it wasn’t expected that this could be delivered within the timescales –so watch this space)

A grant fund for organisations to develop hubs

What we didn’t get
Sheffield didn’t bid for a Cycle City Ambition Grant.  The offer to fund cycling at £10 per head per year was there and it was very disappointing that Sheffield didn’t apply for it.

What’s already being done
Infrastructure

Funded from the Local Sustainable Transport Fund (LSTF) :

–        Extending the Upper Don Valley route alongside Penistone Road from – Hillsborough Leisure Centre to Leppings lane (due for completion March 15)–as part of the Sainsburys development this will be further extended to Claywheels Lane

–       Extending the Blackburn Valley route  from Ecclesfield to Chapeltown

–       Resurfacing the canal towpath between Tinsley and Rotherham (in partnership with Rotherham Council) – will be complete Sept 13

–       Making improvements along the Five Weirs Walk – creating new links, filling in gaps and resurfacing (Due for completion Dec 14)

–       Making improvements to cycle parking around the city – on and off highway including http://www.parkthatbike.info/cycleStands.cfm

–       Developing a secure cycle storage facility at Halfway park and ride (this may well (if successful) be rolled out to other tram and train based Park and ride across the county

 Funded from the Local Transport Plan

–       Creating a  cycle link from Handsworth into the Adanced Manufacturing park at Waverley (due to be completed Dec 13)

–       Improving the crossing points at Hangingwater Road and Whiteley Wood Road (programmed to be delivered summer 14)

–       Opportunities for small scale  cycle improvements as part of the Streets Ahead project PFI opportunities

–       Improved access across the railway line from Oughtibridge into Wharncliffe Woods

Behaviour change/ Smarter choices

Funded from LSTF

–       Sheffield CycleBoost (covering residents and employees in NE Sheffield, Don Valley and City Centre this scheme includes

Free bike loans  and the option to buy the bike at significant discount at the end of the loan period subject to certain conditions

Free Maintenance courses and bike doctor surgeries

Free Training from beginner to advanced

Some of this programme is available to all but only runs in certain locations, I have attached the 2013 programme (this is on top of similar work with employers)

 Publications

Sheffield cycle map published 2012, update due winter 2013

LSTF area bikeability map – map grading roads by the level of ability required to cycle on them – out now

As part of the LSTF project, a pop up bike kitchen in Attercliffe – this will host maintenance courses and will also be a place you can take your bike and fix it yourself by hiring tools on site. To be developed into a cycle hub.

Plans for the future

Developing a Green Routes network strategy to link much of Sheffield’s green space with cycle routes

Investigating solar powered low level way marking  as many of our current ‘green’ routes are not cyclable in the dark.

Working with partners on a Tour de France legacy

On top of this parks and countryside are working on mountain biking, creating trails, improving bridleways, creating a significant social network of cyclists, plus work in schools.

So plenty going on, but lots more needs to be done.  Sheffield City Council needs to have a “Shovel Ready” programme available so when funds come up they are fit to bid – bearing in mind that there is more to developing cycling than putting in cycle routes. In future bids the focus needs to be on utility cycling, since much of the work above will mostly benefit leisure cyclists.

Motorised vandals at work

A Sustrans volunteer writes:

 

You know how we discussed the closure of the above track to motor vehicles on Saturday! Barbara and I went out for a hike on Sunday, and we walked over the moor from the Roundhouse via Redmires. Jesus Wept!! Someone has used a large vehicle to pull the entire locked barrier out of the ground, post an all. So this expensive piece of kit is now lying twisted on the ground. To add insult to injury we had to get of the track to allow 6 off-road motor-cycles to pass. What next – landmines!

Attn Travellers to Nottingham

Travelling to Nottingham in the next 5 weeks?

Nottingham Station is closed between 20 July and 25 August.
You can take your bike on replacement bus services between East Midlands Parkway and Nottingham
(East Midlands Trains to/from Norwich are stopping here) but you must book in advance
or calling 08457 125 678)
Northern Rail services Leeds  – Nottingham are terminating at Langley Mill and there is a bus service Alfreton  – Nottingham that doesn’t take bikes AFAIK.
From Langley Mill you can have a leisurely pootle along the Cromford Canal –  surface a bit rough at first but gets better – which becomes NCN67, turn off at Long Eaton for NCN6, or continue a bit further for the canal towpath which passes the station. Allow a couple of hours for this – Cyclestreets suggests 1 hour for the fastest route using A roads, 1hr 20 for its quietest route which it says is still busy.
More intrepid types could forsake the train altogether and cycle the whole way!

Busy times at Cyclesheffield

- Mick is working on the Scrutiny Committee that will look at how the council promotes cycling and whether it could be doing it better, particular by looking at it as a community and public health issue rather than just a problem to be dealt with on the roads.

– Simon is taking on the proposed removal of a bus lane on Ecclesall Rd, with only a poor quality share use route on the pavement being offered as an alternative.

– Polly continues the good fight with Supertram, persuading them to at least try out the carriage of the occasional carriage of a bike on their very large vehicles at quiet times.

– Matt is working on a number of fronts including taxis stopping in bike lanes, trying to find out what the Sheffield City Region Local Enterprise Partnership and Local Transport Bodies have in store for us, and assessing the impact of the tram-track engineering works on cyclists.

Richard and Ian have been working hard on 20’s Plenty, which of course has benefits for everyone, not just cyclists.

Meanwhile, we’ve been out and about with the stall, talking to cyclists and would-be cyclists, and of course encouraging you all to support us by joining up.

Catch us this week at the Sheffield Grand Prix!