All posts by Mick

SkyRides in Sheffield Summer 2014 onwards

Jonathan Powell, British Cycling, came to the CycleSheffield meeting in March to talk about the plans for Sky Rides in Sheffield in 2014.
He has kindly sent us his notes for the meeting and they are below along with the PPT he used.
Some CycleSheffield members have signed up to work as Sky Ride Leaders

Schedule overview

Start Date: June 15th

End date: November 30th

3 rides a weekend until August the 31st

2 rides a weekend through September and October

1 ride a weekend starting October 26th and continuing through to the end of November

No Rides 6th of July for Tour de France and a Sunday for the Sky Ride City Event. This will be on 10 Aug 2014, a route has been agreed.

Sheffield iconic/stand alone routes

  1. Philadelphia to New York

  2. Full Monty ride – visiting filming locations from the movie. (Mick Nott providing details)

  3. Norfolk Park Easy (Sheffield College – S2 2RL/Goals Soccer Centre – S2 2RU)

  4. Tour de France Route

  5. Iconic 5 – any ideas on this one? What could be a route that would be iconic of Sheffield?

Hubs (places to meet to start and stop rides) and indicative rides

  1. Concord Park – S5 6AE

  1. Easy around Concord park

  2. Steady 5 Weirs ride

  1. Meadowhall – S9 1EP

  1. Easy Ride – Meadowhall shopping trip to New York

  2. Steady route – Meadowhall to Coisley Hill

  1. Forge Valley Sports Centre – Stannington – S6 5HG

  1. Easy route – Around the 1km circuit

  2. Steady 8+ (old Well) route – using part of the TDF route through High Bradfield.

  1. Westfield Leisure Centre – S20 1HQ

  1. Steady to Rother Valley

  2. Steady 8+/Challenge route

  1. Forge Dam – Fulwood – S10 3TE

  1. Steady to Redmires reservoir/Stanage Pole

  2. Challenge route

Back up hubs if required

  1. Niagara Conference & Leisure – S6 1LU

  2. Springs Leisure Centre – Heeley – S2 2AL

  3. EIS – S9 5DA

  4. Hillsborough Leisure Centre – S6 2AN

Routes by Level

Easy

  1. Forge Valley Circuit

  2. Norfolk Park

  3. Meadowhall to New York

  4. Concord Park

Steady

  1. Forge Dam to Redmires reservoir

  2. Westfield to Rother Valley

  3. Concord 5 Weirs ride

Steady 8+

  1. Forge Valley TDF to Bradfield

  2. Philadelphia to New York

  3. Meadowhall steady to Coisley Hill

  4. Steady 8+ from Westfield

Challenge

  1. Forge Valley longer TDF route

  2. Full Monty ride

  3. Forge Dam Challenge

  4. Iconic 5

Tram track replacements taking place over this year

The tram tracks are being replaced. The document below is from SYPTE.
Cyclists, especially cyclists visiting or new to Sheffield, are coming off in the tram tracks and injuring themselves.
We understand that as the law stands if a cyclist comes off on the tram tracks then the company is not liable.
But that is only if the tracks are laid correctly (ie not proud of the surface).
The operator, not the Council, was found liable in Roe v Sheffield City Council and others
The rails being proud of the surface were deemed to allow Mr Roe’s car to skid and the tram operators were deemed liable for his (severe) injuries.
I think this case has gone through appeal and the judgement stands.
CycleSheffield understands that SYPTE own the track and South Yorkshire Supertram Ltd, the operating company, is owned by Stagecoach Supertram.
It is not in SYPTE’s interests to challenge Stagecoach Supertram about the carriage of bicycles on the trams or light rail.

Cycling over or along tramtracks needs care and probably explicit training about angles at which to approach them, how much to lean, when to brake, wet or dry? etc
CycleSheffield think that more could be done to make the tracks safer for cyclists – eg warning signs about the presence of tracks, rubber inserts at crossing points with roads etc.
The Council is to remove the red paint that is between the tracks and the footways especially near tram stops as some cyclists are liable to think they indicate a cycle lane.
Neither SYPTE nor Stagecoach Supertram make any attempt to gauge the number or severity of incidents involving cycles (but neither do SYP or the NGH’s A&E).
The Council receive a steady trickle of letters of complaint or inquiries to sue.
None of these problems were anticipated when the tram tracks were laid in the early 90s but came to light more or less straightaway.

Consultation on cycle path alongside HS2

A colleagues from Leeds Cycle Campaign went along to a meeting about the possible installation of a cycle path alongside the HS2 line.

The Department for Transport (DfT) has commissioned a Feasibility Study into potential demand for cycling in communities along a route that broadly follows the HS2 corridor. The study will examine how we might create a new national cycleway, by linking or upgrading existing cycle infrastructure or rights of way from London to Birmingham and then onto Sheffield and Leeds, Stafford, Stoke and Manchester.

The Feasibility Study is being carried out by Royal Haskoning DVH (a Dutch consultancy) in conjunction with Phil Jones and John Grimshaw (the founder of Sustrans), both of whom were at the meeting.

The primary objective of a linear cycleway would be to provide a national exemplar of modern and international cycling infrastructure fit for 8 to 80 year olds and bringing benefits to local communities along the route to serve both leisure and utility cyclists and walkers by providing safe, convenient, attractive and continuous links to local stations, urban centres, countryside and tourist attractions typically, but not exclusively, within 3 miles either side of the HS2 route.

The primary purpose of the meeting, which was attended mainly by highways and planning officers from the local authorities on the route through Yorkshire, was for the study team to get a very quick introduction to the existing routes, the problems on those routes, and other desirable routes, some of which would need major infrastructure (such as bridges over motorways) to enable them. We also discussed how such a project should be funded and managed.

The consultants will produce a design guide (which could be a very useful reference for other cycling infrastructure projects), and will report back to the DfT in the autumn. It then “only” needs the DfT to provide the funding, and agreement on a body to manage its construction (and possibly maintenance). It’s hoped the cycleway could be built over a period of ten years – i.e. it could be on the ground long before the HS2 railway!

Full Briefing note below

CycleSheffield Matters for CycleForum Tue 18 Mar 2014

Reps from CycleSheffield will be presenting the itemm below to the next bi-monthly CycleForum

These items may receive some discussion and/or be passed on to the best people to deal with it in SCC or elsewhere

We post these to all on the CycleForum list about a week before the meeting – and already a Police Inspector has got back to us to say he would like to come and talk to the Forum about the parking of football coaches on the Sheaf Valley Cycle Route at Asline Rd.

We report back on the responses at our monthly meeting (next one Mon Apr 7) and start to build up our agenda for the next CycleForum (Tue May 20) which will be finalsied at our May meeting (Mon May 12)

CycleSheffield Matters for CycleForum Tue 18 Mar 2014

1. CycleSheffield would like SCC to note:

  1. our response to the DfT consultation on parking;

  2. our appreciation of Greg Challis from the SCC AQAP team coming to the meeting to discuss the Smarter Travel Choices aspect of AQAP 2015;

  3. our recent meeting and discussion with the SCC Cycle Champion, David Caulfield to discuss cycling issues;

  4. the Cycle Expo meeting in Leeds May 1 & 2 2014  – CycleSheffield is sending a delegate and we would appreciate SCC sending one too;

  5. our thanks for a successful initiation of the sub-committee to look at making highway schemes better for cycling;

  6. our thanks for works being done to make small improvements within the Streets Ahead opportunities programme, eg dropped kerbs on Duchess Rd at one end of SVCR and the excellent work being done on Upper Hanover Way.

 

2. Cycle Audits It is now one year since the Cycle Forum meeting in March 2013 where we were led to believe that cycle audits would start.  We understand that some cycle audits have started wrt Streets Ahead opportunities but we do not believe it is the case that is part of the general practice in SCC for highway design or improvements.

  1. It could be argued that the Cycle Forum’s sub-committee is a part of this process.  We think this sub-committee is important but we believe that cycle audits (and walking audits) should be part of the design ‘flow-chart’ – an institutionalised part of the process.

  2. When are cycle audits to be incorporated into the planning and design process as a matter of course?

  3. Has a programme of professional development and training on designing for cycling been established for staff?

  4. Is there a reason for why, one year on, that it feels like very little has been done?

3. SYP and Cycling CycleSheffield met with the Police Commissioner last year to discuss SYP’s response and policies wrt cycling and treatment of cyclists and cycling facilities.  We have had cordial discussions with officers but we do not feel we have got any real engagement.  In some events we feel we have not got anywhere and never will get anywhere.

  1. The evidence collected for the Inquiry into Cycling showed that one of the main reasons that people do not feel able to choose to cycle is because of the behaviour of other road users either when travelling or when they abuse cycling facilities.  Lack of enforcement means that this poor behaviour on the road will continue and deny people the right to cycle.

  2. SYP continue to park football coaches on the Sheaf Valley Cycle Route at Asline Rd and do not seem to be able to locate or be willing to locate alternative locations. This parking blocks the path for every SUFC home game with neither SYP or SCC defining a suitable alternative for cyclists.  This parking creates the impression that it is OK to park on this cycle track.

  3. SYP admit that policing road safety or traffic enforcement is a low priority yet we have at least one yellow box that regularly fills up with traffic blocking a cycle lane across the junction.(Behaviour that SY LAs, and agreed by SYP, noted as common in their submission to DfT on Section 6 of the Traffic Management Act)

  4. SYP will not take action with vehicles parked in cycle tracks as they deem it a parking offence, we deem it obstruction of a cycle track. (See http://www.legislation.gov.uk/ukpga/1988/52/section/21). SYP officers are still parking their vans in the cycle lane on Castle St whilst attending Snig Hill police station.  We believe that these obstructions are hazardous to cyclists and threatens their safety.  SYP will not do anything about this parking on Castle St.  They claim parking coaches on Asline Rd cycle path is for the public safety.  This is obviously a complicated area as SCC have officers who enforce parking regs.  There is a SYP Safer Neighbourhood Team, does SYP talk to SCC about these matters under this umbrella or the Road Safety Partnership that exists between them?

  5. We recognise that SYP officers have treated threatening behaviour towards cyclists on the road with seriousness but we also recognise that officers haven’t done this and in fact cyclists have been harrassed when trying to make statements.  We believe that there is little training for officers in dealing with incidents where cyclists have been put at risk and no consistent policy or practice with abuse of cycling facilities or incidents likely to put cyclists at risk.

  6. SYP would like cyclists to report incidents and to attend Safer Neighbourhood Team Consultations which may be done through Ward meetings.  However we do not believe that this will satisfactorily address the issues above when an advocacy/campaign group is addressing city-wide issues that may affect the whole of SYP and certainly its Sheffield District.  We would value SYP attending the May or July CycleForum to discuss:

  7. the priority given to the enforcement of road safety and poor road behaviour;

  8. the parking of football coaches and police vans;

  9. the guidance or training officers receive to deal with incidents where cyclists are put at risk.

6. Taxis The hope was that when Castlegate market was closed that the number of taxis at the taxi rank would reduce and taxis would no longer park in the contraflow cycle lane.  We can report that this is not the case.  Taxis still park in this lane.

  1. We want Parking Services to increase their monitoring & enforcement  and POs to warn taxis of obstruction of a cycle track

  2. We want the licensing committee to treat this offence (or multiple offences by taxi drivers) more seriously and consider and change the current disciplinary policy.

  3. Our colleagues in Leeds are taking part in a LCC consultation about the ‘fit and proper persons’ criteria for taxi drivers in Leeds with a view to granting 3 yr licences.

  4. Are people with criminal convictions allowed to be taxi drivers in Sheffield?  

  5. Are there Sheffield taxi drivers who have convictions for criminal motoring offences?

7. Castle St The design of Castle St with the contraflow cycle lane and the bus stops means that buses have to cross the solid white line on the mandatory contraflow cycle lane to pass stationary buses.  We need help here with interpretation.  We think this is hazardous and not legal unless the TRO says it is.  The TRO as far as we can see does not say that crossing the solid white line is permissible.  The Highway Code Advice is: 140 Cycle lanes. These are shown by road markings and signs. You MUST NOT drive or park in a cycle lane marked by a solid white line during its times of operation. Do not drive or park in a cycle lane marked by a broken white line unless it is unavoidable. You MUST NOT park in any cycle lane whilst waiting restrictions apply. Law RTRA sects 5 & 8

  1. We want Sheffield Bus Partnership to discuss this matter at the earliest opportunity, something is very wrong here and the city inner ring cycle route is compromised.

8  Five Weir Ways and Towpath

  1. Last CycleForum (Jan 2014) we raised out concerns about the construction of the Bus Rapid Transit Northern Route that went to Cabinet on Wed 20/11/13.

  2. The 5WW from Weedon St to Meadowhall South tram stop has been closed and is being dug up and used as the route for the district heating pipes.  (We hope that whilst this disruption is concurrent for the BRTNR construction on Meadowhall Way).

  3. The Meadowhall to Rotheham towpath is now closed at Tinsley – for NINE months – for construction of the BRTNR onto Sheffield Rd.  Access is not available again until Bessemer Way leading to Brinsworth Lock (at which point you may as well carry on Sheffield Rd to R’ham).  No alternatives (‘safe’ or otherwise) have been provided for cyclists.  Members who use these routes are appalled thatno warning appears to be given or that no altreantives seem to be have been considered by EoN, SCC or RMBC.

  4. This follows the fiasco of the recent disruptions to National Cycle Network Route 6, where no warning was given and no diversions have been posted (other than by volunteer rangers) We request that the following measures should be put in place.

  5. Sustrans to be notified of all works on NCN routes at least one month before they begin.

  6. Diversions to be agreed by Rangers and posted.

  7. Where there is space (as on Meadowhall Way) an alternate walking and cycling route to be marked out by temporary barriers, so that the option of a traffic-free route is preserved.

9 Glossop Rd & Clarkehouse Rd cycle lanes.

  1. We understand the position re Clarkehouse Rd, where it is difficult to prosecute people who sit in their cars and drive off when parking enforcement officers approach,

  2. But we ask SCC to note that people are getting away with parking outside the shops on Glossop Rd at Urban Clearway times.   (We note that Parking Services had a recent enforcement campaign on Carlisle St outside Tesco.  Sometimes these issues are resolved not as a matter of road design but of enforcement)

Getting the best from the email list

CycleSheffield Communications

About three months ago we had a flurry of emails about how difficult it can be to read the  emails from CycleSheffield.  

This note tries to help members sort out receiving and posting emails to other members.

What channels do we have?  We have four channels.  An email list (also a web based forum), a fb page, the website and a twitter feed.

The email list is the only channel solely open to members.

Anything posted on the email list is members talking to members so CycleSheffield officers know the views of members.

Receiving emails

Your preferred email address is in the CycleSheffield web-forum list.

Anything posted will end up in this email address’s  inbox. (except anything you post until it gets a reply; then you’ll get yr message and the reply)

The next bit is where you lose the will to live.  There are four settings:

  1. No email: web-only participation

  2. Abridged Email: one summary email of new activity per day

  3. Digest Email: up to 25 full new messages in a single email

  4. All Emails: send each message as it arrives

We have put many people on 2 or 3 at their request but the reading experience of these options is poor: replies jumbled up with messages; messages being re-iterated loads of times etc.

  • If you want to keep up with emails and post responses then the best option is to be on 4.  All Emails. An email and its consecutive replies with same subject line arrive in yr inbox as they are sent
  • To stop yr inbox clogging up set up a CycleSheffield folder on yr email and filter all messages from CycleSheffield into it.
  • An email and its replies will be clustered under the original subject heading, (which is why it is important to keep replies pertinent to the subject heading).

Posting emails

The email address for the list is cyclesheffield@googlegroups.com

Members can post to this address from yr preferred email address

Advice on editing emails and replies

Check out the advice on http://www.cyclesheffield.org.uk/campaignsandcoreprinciples/acceptable-use-dispute-policies/

Changing the settings

If you want to change your settings to 4. All Emails or 1. No Emails you can alter it yourself on the web-forum or ask me at membership@cyclesheffield.org.uk

 Clear as mud eh?

Mick

CycleSheffield response to DfT Consultation on Local Parking

Cycle Sheffield responded to the Government consultation on local authority parking.

Our SCC liaison officer flagged it up to us.

Many thanks to Dave Holt  for doing this and consulting with us all at meetings and on email.

Here it is

Annex A – List of questions

Q1. Do you consider local authority parking enforcement is being applied fairly and reasonably in your area?

Sheffield City Council generally operates fair enforcement of parking regulations, although there could be better training provided to their Civil Enforcement Officers (CEOs) who could be ‘braver’ when making decisions.  The number of CEOs is inadequate outside the city centre – some motorists know that there is little chance that they will receive a fine and park accordingly.  Signage could be improved and street lining renewed more frequently to ensure road users have the correct information.Existing problems would be exacerbated were there to be a perceived or actual reduction of powers to keep the streets clear of inconsiderate or dangerously parked vehicles.Revenue from parking fines should fund greater numbers of CEOs and the renewal and improvement of signs and lines.  Surplus revenue should be ring-fenced to encourage active travel modes of cycling and walking which require far less road space than a private motor car.  Many car journeys in Sheffield are under four miles, a distance easily cycled where supportive facilities exist and prospective cyclists offered training.  Conversely any reduction in parking enforcement encourages more car journeys with the result of increased congestion and pollution while discouraging the take-up of active modes which would themselves reduce the demand for parking spaces.

 

Q2.The Government intends to abolish the use of CCTV cameras for parking enforcement. Do you have any views or comments on this proposal?

The guidance document for this consultation rightly points out that there are difficult and sensitive situations where the choice is between CCTV enforcement, or there being no enforcement.  In Sheffield we have a serious issue with a minority of Hackney Carriage drivers parking in mandatory (solid white line) cycle lanes.  Because they simply drive off when a CEO approaches the danger they cause is impossible to punish with a fine.  A vehicle fitted with CCTV can record license plates and return three minutes later to record again and determine which vehicles were parked.  This is fair and proportionate and backed by the majority of taxi drivers who are being disadvantaged and stigmatised by the actions of a selfish minority.  Without CCTV enforcement lives are put at risk as cyclists have to go around the taxi and in to fast-moving oncoming traffic.  The alternative is a permanently stationed CEO at this location which is hardly cost-effective!

Q3. Do you think the traffic adjudicators should have wider powers to allow appeals?

We do not have sufficient information to provide a response.

 

Q4. Do you agree that guidance should be updated to make clear in what circumstances adjudicators may award costs? If so, what should those circumstances be?

We do not have sufficient information to provide a response.  

 

Q5. Do you think motorists who lose an appeal at a parking tribunal should be offered a 25% discount for prompt payment?

No as this will simply encourage vexatious and time-wasting appeals.

 

Q6.Do you think local residents and firms should be able to require councils to review yellow lines, parking provision, charges etc in their area? If so, what should the reviews cover and what should be the threshold for triggering a review?

Whilst supporting the principle of democracy and community involvement, the Council is best placed to act in the interest of all road users.  Shop-keepers for example frequently underestimate the proportion of their customers who walk or cycle to their premises when they request extra parking with light enforcement.  Whilst this may encourage more motorists, the increased traffic and presence of parked vehicles results in a less pleasant (and frequently hostile) environment to customers who would walk or cycle – and who will then choose to shop elsewhere.  Reducing enforcement also encourages longer stay parking by motorists who probably aren’t using the business at all – which reduces available parking space with no benefit to the business.Yellow lines specifically help to ensure that traffic flows freely and that sight lines which are crucial to safety are kept clear.  Restrictions are in place only where required.  Residents and businesses can already inspect the corresponding Traffic Regulation Order (TRO).   New TROs are always publicised and resident and business feedback sought.

Q7.Do you think that authorities should be required by regulation to allow a grace period at the end of paid for parking?

We do not have sufficient information to provide a response.  

 

Q8. Do you think that a grace period should be offered more widely – for example a grace period for overstaying in free parking bays, at the start of pay and display parking and paid for parking bays, and in areas where there are parking restrictions (such as loading restrictions, or single yellow lines)?

No. Our crowded towns and cities can only ever have a limited amount of on-street parking available which must be used efficiently.  When a greater demand exists, private operators will provide additional capacity off-road.  The roads network should prioritise space for journeys by all modes (including active) rather than being obstructed by parked vehicles. Inconsiderate parking is an increasing problem where the attitude of a sizable minority of motorists “right to park” far exceeds any danger (however temporary) that their actions cause.  Already CEOs rarely patrol Sheffield suburbs and their effectiveness would be further reduced by a mandatory “grace period” which would reinforce the present free-for-all attitude of some motorists.  Examples of these problems are numerous but best demonstrated at the gates of any school at the beginning and end of the day where wide-scale inconsiderate and dangerous parking puts young lives at risk.

Q9. If allowed, how long do you think the grace period should be?

At the very least there must be NO ‘grace’ period for dangerous parking in cycle lanes, pedestrian crossings, dropped kerbs, school entrances, pedestrian/cycle crossing facilities etc.

 

Q10. Do you think the Government should be considering any further measures to tackle genuinely anti-social parking or driving? If so, what?

This review should be a great opportunity to make our cities and towns better places to live.  Relaxing parking enforcement will result in more people driving which means more congestion and longer journey times.  Businesses will find it harder to find a space to service their customers because parking spaces will already be full! Space is finite so the Government should instead be prioritising measures to encourage walking, cycling and public transport.  Those objectives would actually achieve the aims of this review as there would be a greater availability of existing parking provision where a greater proportion of journeys are shifted away from the private motor car.  At present most people feel they have little option other than to drive as the roads are too hostile to cycle or walk, a situation which must be urgently addressed and reversed. 

The small minority who repeatedly wait or park in a dangerous way should be targeted with penalty points, for example on yellow lines or mandatory cycle lanes.

 

To encourage people to use town centres instead of out-of-town developments requires a brave Government to introduce mandatory parking charges of £1 per hour, except for the smallest operators.  At present the cost of land and maintenance to provide ‘free parking’ is passed on to all customers which includes those arriving by public transport and active travel – and who are effectively subsidising those who drive!  This nonsense is skewing travel choices in favour of the private car and customers away from our towns and cities.

 

 

 

Tour de France Arts Festival

Here is the Arts Festival

I must get a ticket to see Maxin Peake’s adaptation of her radio play, Beryl, at the W Yorkshire Playhouse

CycleSheffield will be putting on a Barnsley FridayNightRide as part of the Bike Show there

and CycleSheffield member Rod Ismay is leading a Bell ringing festival on the days of the Tour in Yorkshire – see last box

Plenty to see and do

•          Yorkshire Festival 2014 is the first ever arts festival to precede the Tour de France, the world’s biggest annual sporting event

•          Yorkshire Festival 2014 will run from 27th March to the 6th July 2014

•          Yorkshire Festival 2014 is backed by Welcome to Yorkshire, Yorkshire Water and Arts Council England as well as Local Authorities across the county

YORKSHIRE FESTIVAL 2014 COMMISSIONS

 

Name of project & dates (in order) Company Brief Overview
Seven Major Commissions    
Tour De Cinema 

March 27 – July 5

 

Pan – Yorkshire

Sheffield Doc/Fest 

PR contact:  Sylvia Wroblewska, Business  and Marketing Director

sylvia@sidf.co.uk

07775 537616

Award winning director Daisy Asquith teams up with cult musician Bill Nelson to create a new film as part of a series of screenings to be shown on 10 outdoor screens in stunning locations across Yorkshire. TOUR DE CINEMA presents fiction and documentary films (including Alan Bennett’s rarely seen BBC film ‘A Day Out’, about a Halifax cycling club; and Jarvis Cocker’s blazing soundtrack for The Big Melt) also in 35 local Town Halls as well as city centre big screens.
Fields of VisionWorkshops: April & May

Installation: June 1 – July 6

South Pennine

Pennine ProspectsMark Turner

mark.turner@pennineprospects.co.uk

Mob: 07582 102109

Fields of Vision will comprise of huge, grass-based land art installations in the stunning South Pennine Landscape.  It will bring together artists, young farmers, cyclists and the community.
Thomas Houseago 

End of April – October

Wakefield and Leeds

Yorkshire Sculpture TrianglePR  contact:

rebecca@henry-moore.org

0113 246 7467

The YST’s first ever commission:  LA-based, Leeds-born artist Thomas Houseago who will create two spectacular sculptures in Leeds city centre and for Yorkshire Sculpture Park for the very first time.
The Tour of Infinite PossibilityWorkshops end of April, tours over two weekends:

7/8th June &

21/22nd June

Grassington Fest/Hope & Social 

Rachel Aulty

press@grassington-festival.org.uk

Mob: 07545 917044

Hope & Social will recruit, rehearse and create A Band Anyone Can Join for Yorkshire to play 12 shows in 12 locations (TBC) across the two stages of the race.They will release official festival song The Big Wide for artists and audiences to ‘make their own.
Ghost Peloton 

May 16 – May 17

 

Leeds

Phoenix Dance Theatre & NVA in partnership with SustransPress contact

Tony Shepherd 07956 655813

tony.shepherd@btopenworld.com

For interview: 

Sharon Watson Phoenix Dance Theatre. Contact Abi Cattley

abi.cattley@phoenixdancetheatre.co.uk  0113 236 8130

Angus Farquhar NVA creative Director. Contact Annie Crabtree

Annie@nva.org.uk 0141 332 9911

Ghost Peloton is a highly ambitious collaboration between two of the UK’s most respected arts organisations; Phoenix Dance Theatre and acclaimed Scottish public arts charity NVA.They will create the world’s first ‘Ghost Peloton,’ which will appear on film and see 50 choreographed cyclists in programmed light suits performing in central Leeds.
Bike Story 

June 20-July 5

 

Pan Yorkshire

509 Arts Ltd 

Jenny Harris

jenny.harris@509arts.co.uk

Mobile: 07505 127631

Bike Story is about people and their relationship to the bicycle. Everyone has a bike story and the organisers want to hear yours. The ups and downs of cycling, the traumas as well as the triumphs. Mike Kenny and Martin Riley will weave a selection of these into a very special outdoor performance that will visit locations across the county, thrilling and entertaining audiences of all ages.
Hypervelocity 

July 2 – 6

 

Kirklees

Kirklees CouncilGillian Donohoe

Senior Marketing & Communication Officer

01484 221000

07528 252294

gillian.donohoe@kirklees.gov.uk

Hypervelocity will use the streets of Huddersfield through to Holmfirth and Holme Moss as a giant canvas on which to display the most amazing creativity with performances and installations by international and regional artists and local communities.  Watch out also for mysterious goings on in St George’s Square! 

 

 

Date order Summary of 40 commissions
Bonjour! Film your Tour competition 

Film shown at various locations and dates

Sustrans 

PR contact: Emma Peasland 07768423652 and 01132450006

emma.peasland@sustrans.org.uk

Sustrans will run a county-wide competition in schools for a chance to be part of a short film explaining what the Tour de France is.  Six winning schools will be selected to film six winning videos to professional quality which will form one overarching film. 
Cheer SingWorkshops:

March – June

Cheering: July 5&6

Pan Yorkshire

Louise Gibbslouise@jazzmine.co.uk

07813 684 077

0113 294 8008

Cheer-Sing workshops will teach communities along the route to devise, lead and perform their own chant-songs and clapping-raps, raising a mighty wave of support for the racers. 
DepARTures 

March 27

 

Pan Yorkshire

Cape UK 

Steve Pearson, Communications Manager

steve.pearson@capeuk.org.uk

0113 322 3050

07843 038775

CapeUK will enable all schools in the Yorkshire and Humber region to engage with Yorkshire Festival 2014 through 15 downloadable resources. Resources will support schools to find exciting ways to link to the Festival and encourage more young people to experience world class art and culture in Yorkshire.
Kes March 27 – April 5

Crucible Theatre, Sheffield

Sheffield TheatresLucy Smith / Lisa Hawkins

Tel: 0114 201 3828

l.smith@sheffieldtheatres.co.uk or l.hawkins@sheffieldtheatres.co.uk

 

A world première of a new dance-theatre adaptation of a much-loved Yorkshire story – Kes
The Sheffield Steel Peloton 

March 27 – June 28

 

Sheffield

Sheffield Peleton Field Cycles 

Mark Bull

sheriff@zerobelow.co.uk

0114 2679099

07765136992

The Sheffield Steel Peloton invites local artists and public to discover Sheffield’s finest export – Steel. Raw material of iron ore will be sourced from the ground in Sheffield (something not done for hundreds of years), smelted and sculpted to produce a unique one off bike head post badge designed by a Sheffield based illustrator to celebrate the Grand Départ.
A Taste of Honey 

March 27 – 19 April (Press night 1 April)

Hull / Doncaster / Scarborough

Hull Truck Theatre 

Dan Baxter, Email: marketing@hulltruck.co.uk

Tel: 01482 325 012

 

Directorial debut at Hull Truck of new Artistic Director Mark Babych in Shelagh Delaney’s classic set in Salford.The production will move from Hull to the Cast Doncaster May 13 – 17 and then SJT Scarborough May 20 -24.
True Grit Digital Poetry 

March 27 – May

Khadijah Ibrahiim 

khadijah.ibrahiim@googlemail.com

07796 900213

The True Grit Cycle uses the vibrant, engaging form of performance poetry to hear the direct, honest, imaginative voices of Yorkshire people speaking in their own communities and landscapes.
tutti frutti productions and York Theatre Royal

April – June

Pan Yorkshire

Alison PoveyTour Manager

Alison@tutti-frutti.org.uk

0113 388 0027

 

Monday’s Child by award winning writer Brendan Murray, for children aged 3+ and their families. A simple poetic story of the unique bond between a grandmother and a child.
Wu Chi-Tsung – Dust 

4 April – 31 May

 

Sheffield

Site Gallery, Sheffield  Site Gallery presents two interactive installations by the Taiwanese artist, rising star Wu Chi-Tsung. Crystal City 003 and Dust make use of everyday materials, plastic boxes, lights and dust, to create meditative dream worlds. This is the first chance for UK audiences to see Dust, which was produced by Site Gallery in 2006 and shown later that year at the Shanghai Biennial. It captures the shadows of tiny dust particles as they spiral around the audience to make a mesmerising abstract projection. 
The Grand Departs 

April 5

 

Starting from

Mytholmroyd, Calderdale

12 noon

I-move 

Elenid Davies

elenid@imovearts.co.uk

07796 098493

 

Music and cycling challenge to test how many cyclists it takes to pull a grand piano up one of the longest continuous ascents in England. A range of pianists, professional and amateur, are being invited to play a specially composed piece of music as a team of cyclists attempt the arduous task. Spectators and supporters are invited to join in a send-off event and cheer the team on.
Ursula von Rydingsvard 

April 5 – Jan 2015

Wakefield

Yorkshire Sculpture Park 

Nina Rogers

Nina.rogers@ysp.co.uk

07973 432489

Major exhibition of sculpture by Ursula von Rydingsvard. The exhibition is the highly acclaimed American artist’s first large-scale survey in Europe and will premiere new, large-scale work.
Theatre Tol, Spirit Festival 

April 12, 8pm

 

Dewsbury

Kirklees CouncilGillian Donohoe

Senior Marketing & Communication Officer

01484 221000

07528 252294

gillian.donohoe@kirklees.gov.uk

Theater Tol’s Luce (Belgium):  Inspired by the struggle between the mutually antagonistic Italian cyclists Fausto Coppi and Gino Bartali and set in the 40s and 50s, Luce tells of their rivalry.   It’s a battle on two wheels and a passionate love story with cinematic images, songs, dance, secret love letters, Luce end in a spectacular aerial show. 
National Student Drama Festival – Sunday TimesApril 12 – 18

Scarborough

Michael Brazier 

Michaelbrazier@nsdf.org.uk

020 7036 9027

The National Student DramaFestival is a Yorkshire institution.

It draws hundreds of rising stars –

actors, writers, directors, technicians and producers from across the UK.

Art and Yorkshire: Turner to Hockney 

April 12 – Oct 12

Harrogate

The Mercer Gallery 

Jane Redfern

pr@janeredfern.co.uk

07724 131179

Art and Yorkshire: From Turner to Hockney, this is an exhibition of historic, modern and contemporary visual art that defines the spirit of Yorkshire.
From Versailles to Yorkshire: Sevrès and Moore at Harewood 

From April 18 – November 2

Harewood House Trust Ltd. 

PR contact: Alexis Guntrip,

alexis.g@harewood.org

0113 218 1225

07967 223 691

In 2014 Harewood’s House and grounds plays host to a stunning display of works by French and British masters and contemporary artists: from the iconic sculptures of that quintessentially Yorkshire son Henry Moore to a tiny, exquisite tea set owned by the extravagant, ill-fated Queen Marie Antoinette of France.
The Fantastical Bike ParadeApril 26

Todmorden

Handmade ParadeJacqui Matthews

todmorden@ytbtic.co.uk

07825 627798 /01706 818181

A parade through Todmorden of fantastical bicycle creatures preceded by participatory workshops
Poised (2012) 

May 10 – June 29

 

Hull

Ferens Art Gallery 

Anna Pilgrim

anna.pilgrim@hullcc.gov.uk

01482 248359

07720 095754

The Ferens Art Gallery will work with Film and Video Umbrella and the artist Dryden Goodwin to present an existing video installation, ‘Poised’ (2012), in a new context whilst involving and inspiring local communities to produce their own creative responses to the exhibition.
Graham Watson exhibition 

May 15 – August

 

Leeds

White Cloth Gallery 

Sharon Price & Peter Dench

07791 253407

sharon@whiteclothgallery.com

peter@whiteclothgallery.com

Exhibition of photographs by world renowned and respected cycling photographer, Graham Watson who has  photographed the TdF from 1982 to present. Working in partnership with Rouler Magazine, White Cloth Gallery will also be exhibiting the work of Bernard Thompson – a photographer who concentrated on cycling from the early 60’s through to the mid 80’s.
Bike Show  

May 16 – July 12

 

Barnsley

The Gallery@ The Civic 

Miz De Shannon, Marketing

mizdeshannon@barnsleycivic.co.uk

01226 327108

 

David Sinclair, on 01226 327011, email davidsinclair@barnsleycivic.co.uk

Exhibition BIKE SHOW will show the influence of cycling culture on contemporary design. From technological advancements, to bikes made of sustainable materials to how to avoid bike theft, the exhibition will also examine the spectacle of the TdF –its history, its language and some Yorkshire riders who have ridden it.
I Fagiolini  

May 23

 

Beverley

National Centre for Early MusicPR contact: Shona Galletly

e: shona@shonagalletlypr.co.uk

m: 07813 796 733

 

I Fagiolini brings to life the music, mayhem, political intrigue and comic entertainment of Venice at Carnival through the music of Banchiere, Monteverdi, Gabrielli and Vecchi’s madrigal comedy L’Amfiparnaso.
The Hunt 

May 26 – June 30

 

Pan Yorkshire

Frolicked 

PR contact and lead artist Beka Haigh

Mob: 07947 578181

Email: admin@frolicked.co.uk

Treasure Hunt around Yorkshire, beginning with four mini hunts. Clues at these four events lead to a final hunt at an undisclosed location.  At each location, Frolicked’s distinctive puppets will make appearances, helping to guide hunters towards the prize.
The Last Train to Scarborough 

May 30 – June 14

 

Scarborough

Su-Ann Chow-Seegoolam 

Su-ann.chow@sjt.uk.com

01723 356666

07577 636465

This stage adaptation of Andrew Martin’s 2009 novel will be a world premiere presented in association with the National Railway Museum in York and adapated and directed by Chris Monks.
Carnival Bentham by Bike 

May 31

 

Bentham, Craven

Pioneer  Projects (Celebratory Arts) 

Sean Sanderson

01524 262672

A trail of public artwork will be created at the Bentham Passing Place, a circular detour off the Way of the Roses cycle route.  It is the first time Bentham havs engaged with a public art project and artworks will be in place by summer.
Yorkshire in Yellow 

31 May  – 7 Sept

 

Millennium Gallery, Sheffield

Museums Sheffield & Made North 

Chris Harvey [Comms Officer]

chris.harvey@museums-sheffield.org.uk

0114 278 2664

Yorkshire in Yellow invites contemporary artists, designers, and creatives with a Yorkshire connection to design a tribute to the Tour’s famous yellow jersey using yellow t-shirts as their canvas. These unique designs will be brought together to form a striking new display in the Millennium Gallery’s main thoroughfare.
Cold Bath Slow Art 

June 7-8, June 14-15, July 5-6

 

Harrogate

Chrysallis 

Rick Faulkner

slowart@chrysalis.com

07702 128443

To create celebrations on Cold Bath Road which engages with the community and celebrates the Tour de France in Harrogate, whilst simultaneously drawing attention to the benefits of sustainable transport
Le Grand Voyage  

June 6,7 and July 5,6

 

Harrogate Theatre

Harrogate Theatre 

Executive Producer Kevin Jamieson

Kevin.jamieson@harrogatetheatre.co.uk

01423 502710 ext 104

Michaela Noonan [PR]

Michaela.noonan@harrogatetheatre.co.uk

01423 502710 ext 106

An unforgettable theatrical experience throwing participants into the beating heart of the Grand Départ in a way like no other. This touring virtual reality bicycle ride, in which the participating cyclist gets to be a rider in an unusual version of the Tour de France, features the Yorkshire landscape – and more far-flung places. Created in collaboration with Il Pixel Rosso. 
North Yorkshire Open Studios 

June 7-8, June 14-15

 

North Yorkshire

Chrysalis Arts 

France-Leigh Hadrysiak

franceleigh@nyos.org.uk

07813 450451

01756 748529

 

North Yorkshire Open Studios is in its tenth year and has grown to become one of the major events in North Yorkshire’s cultural calendar.  Professional artists open their studios to the public over two weekends and offer workshops, exhibitions, geocaching trails and arts walks.
Götterdämmerung 

June 14, June 18 + July 12

 

Leeds

Opera North 

Julia Gregg,  Interim Press & PR Manager

Tel: 0113 223 3526 julia.gregg@operanorth.co.uk

Opera North is celebrating the Grand Départ as part of Yorkshire Festival 2014 with the final part of an exhilarating journey of its own. Götterdämmerung, or Twilight of the Gods, is the last opera of Wagner’s epic Ring Cycle which will come to a conclusion just before the biggest cycle in sport takes off from Leeds.
Tour de Force Bicycle Orchestra 

June 20 – June 21

 

Huddersfield

Huddersfield Contemporary Music Festival (hcmf//) & artists from Levenshulme Bicycle Orchestra 

Sarah McWatt

s.mcwatt@hud.ac.uk

01484 471116

07989 669521

Join hcmf// at workshops designedto take recycling to a new dimension by building musical instruments from bike parts. hcmf// will help you explore your bicycle’s tuneful possibilities and  discover new sounds and music. Once made, you’ll play bicycle music with the rest of your orchestra.
Wish you were here 

21 June

 

Grassington, North Yorkshire

NYMAZ 

 

Heidi Johnson

Heidi@nymaz.org.uk

07745 087378

01904 543382

Wish You Were Here is an opportunity for seven communities in North Yorkshire to celebrate what’s truly special about their area by writing and performing their own original songs, aided by a great team of musicians drawn from NYMAZ’s experienced delivery partners.
Tour de Brass 

June 21 and 22

 

Pan Yorkshire

Brassed on York Ltd 

Contact for press: Kate Lock, Klockworks@btinternet.com 07792 633984

 

TOUR DE BRASS is a weekend of brass-band concerts taking place across Yorkshire in locations along the two stages of the Grand Depart, culminating in a grand finale in York on the Sunday night with the Tour de Brass Yorkshire Prom concert performed by the world-famous Black Dyke Band.Details about bands and locations will be on the Yorkshire Festival website and www.brassedon.org

 

The Really Big Sing 

June 24

 

Scarborough OAT, North Yorkshire

Create Arts Development Ltd 

Michelle Watts

michelle@create.uk.net

01723 384546

The Really Big Sing is offered to every school in North Yorkshire, culminating in ‘A Really Big Sing’ performance of the songs with up to 6,000 pupils and staff at the Open Air Theatre in Scarborough – bringing the Tour De France Cultural Festival to the Coast.
Bicyclism 

June 24 – July 7

 

Leeds City Museum, Millennium Square

Jenny Harris 

jenny@jennyharrisuk.com

07505 127631

Bicyclism is an exhibition, website, performance and publication about the people in and around Leeds that inhabit cycling, its history and its popular culture.  The project will be curated, created and delivered by Leeds based artists, writer and musician Boff Whalley and photographer Casey Orr.
Lost Boy Racer 

June25 – 27

(Press Night June 26)

 

Lawrence Batley Theatre, Huddersfield

Laura Rodwell 

laura@thelbt.org

01484 484402

LOST BOY RACER is a quirky northern comedy-drama with a touch of blood-sweat-and-tears, a large dose of cycling wisdom lubricated with fun and farce, with some off-the-wall dance and bike antics and a love story of sorts.The production will feature a special set made of bike parts from sculptor Tim Tolkien.
Bicycle with Barefoot 

June 27 -28

Halifax

Annapurna Indian Dance with Hebden Bridge Arts Festival, Halifax Festival & Eureka! National Children’s MuseumShantha Rao

01422 209906 / 07737 759783

shantha@annapurnadance.com

A small scale dance show combining Indian dance with the creation of a bicycle painting, shared with the audience at the end of the performance at Eureka!
Beryl by Maxine Peake 

June 30  – July 19

 

Leeds

West Yorkshire Playhouse 

Paula Rabbitt

Paula.rabbitt@wyp.org.uk

07948 380362

 

Beryl Burton was one of the greatest cyclists the world has ever seen. She was born less than 3 miles from West Yorkshire Playhouse and trained with Morley Cycling Club.  Originally written for radio, TV star Maxine Peake has adapted her own script for the theatre.
Cart before Horse 

June 30 – July 6

 

Pan Yorkshire

Stumble Dance Circus 

Mish (Michele) Weaver

mish@stumbledancecircus.com

07932 630576

Cart before  Horse  is a powerful new contemporary circus performance which will be created especially forLe Grand Départ.  It will include workshop activity around trick cycling and other circus skills and a piece which tours outdoors in six shows across Yorkshire.
The Woolly Bike Trail  

July 1 – 31

Cassandra Kilbride 

Woollybiketrail@hotmail.co.uk

 

07532 097790

Cassandra Kilbride is a prolific yarn-stormer. For the Grand Départ, Cassandra is creating ten woolly bikes based on familiar Yorkshire themes, from woollen mills to whippets. Followher thread between locations, or take

part in a free workshop.

Festival of Colour Light and Space 

July 3 – 6

 

Sheffield

Sheffield Cathedral 

Rachael Savage

 

Rachael.savage@sheffield-cathedral.org.uk

07890 390331

0114 263 6951

In its centenary year, Sheffield Cathedral will be working with Eye Music Trust and Yorkshire artists to undertake a creative outreach programme that will culminate in a 5 day creative showcase within the stunning. Colourscape arts installation on the Cathedral forecourt, inspired by the visit of the Tour de France to Yorkshire.
Bell Ringers Herald Cyclists 

July 5 & 6

 

Around TdF routes

Yorkshire Association of Change Ringers 

Rod Ismay

Email rismay@virginmedia.com

Phone 07913 909 787

Church bells across Yorkshire will welcome Le Tour with traditional English change ringing. As well as ringing bells on the route as the cyclists approach, ringers from around the country will be invited to join in a Festival of Ringing as part of the 100 day cultural event.

 

Reaction to the Air Quality Action Plan 2015

Reaction to the Air Quality Action Plan 2015

1. What’s the story?

  1. I’ve been following up a story in the Sheffield Telegraph “Traffic Strategy on the Way” p5 12/12/13 (and also partially here).  SCC has improving air quality high on the agenda for action and it needs to take, and be seen to be taking, effective action.
  2. The Council is likely to be heftily fined if it does not meet EU and UK air quality targets and has taken too little action to reduce it by 2015.
  3. The Council has an action plan for reducing air quality up to 2015 (AQAP 2015) which was adopted by Cabinet in July 2012 but it may be felt that not enough has been done in the last 18 months.
  4. After extensive and thorough monitoring, the report notes that road vehicles’ emissions contribute 50% of NOx pollution and 40% of particulate pollution in Sheffield and vehicle exhausts are the biggest single cause of air pollution.

2. Why is the story important?

  1. Sheffield’s Director of Public Health, now an SCC employee, has reported that approx 500 deaths a year can be attributed to the poor quality of Sheffield’s air (see p20&21 and the footnote on p21 of his 2013 report. ).
  2. Everyone of these deaths is classed as preventable.  To put this death toll into context: there are 4500-5000 deaths a year in Sheffield, which means that approx 10% of all deaths can be linked to poor air quality.  Death caused by poor air quality may well be the highest cause that can be linked to preventable deaths, mainly preventable respiratory and cardiovascular deaths, in Sheffield and, really, is a public health scandal.  It’s also a fairness issue because most of the people affected don’t own a car but live in the pollution and it disproportionately affects the very young, the old and those with existing heart and lung conditions.
  3. The Director of Public Health has been assigned the role of the Council’s Air Quality Champion.
  4. The plan has much to say about walking and cycling and I think should be of interest to CycleSheffield.

3. What actions are proposed?

The report lists actions that it thinks it can take up to 2015 which should help reduce air pollution.  Sheffield has an Air Quality Management Area, which tellingly is all of Sheffield except the area within the Peak District National Park and the city boundaries.

The action plan has specified seven actions:

  1. Feasibility study of a Low Emission Zone (LEZ)
  2. Develop infrastructure for refueling low emission vehicles (LEV)
  3. Promote smarter travel choices
  4. Improve engine performance of commercial diesel vehicles
  5. Mitigate the effect of the M1
  6. Develop policies to support better air quality
  7. Control industrial emissions

Action points 1, 2, 4, 5, 7 as they have little to say that directly relates to cycling. Action 1 is a feasibility study to see what boundaries there could be for an LEZ and what actions are needed.  There will be initiatives with road haulage companies, bus companies and taxi licensing on improving engines. Action 2 is about increasing gas (LPG) fueling points electric vehicle charging points.  This action will be dependent on successful bids for Government and European grants and also will need to be across the Sheffield City Region (SCR) not just in Sheffield city.  Action 4 is voluntarily working with bus and haulage companies to update their vehicles or the engines in their vehicles.  It is also about taxi engines and as SCC licenses the taxis it is one thing they can control by only licensing vehicles with ‘clean’ engines.  Action 5 notes that there is very little SCC can do with the M1 other than work with and lobby Government via the DfT and the Highways Agency to ensure that the amount of vehicles and their speed is controlled to reduce emissions.  Action 7 is about working with the Environment Agency and companies to ensure that when emission permits are granted, they are also enforced, and regulated sites are updated as and when needs be.

4. Action 3 Promote smarter travel choices.  The actions proposed here are to get more people on public transport, encourage tele-working, get car share programmes set up, and get more people cycling and walking.  Text in italics is a direct quote from the action plan.

“SCC will develop specific schemes to get employees to and from work and children to and from school such as Bike It, which promotes cycling through schools “

  1. The Bike It initiative is funded by Sustrans and I think has had an impact on 50 schools so far and we are not sure what the success and monitoring criteria are. I have heard that if a student cycles to school once a week then that is a ‘tick’.  We can ask questions about the uptake and impact of Bike It at the next Cycle Forum.
  2. What the AQAP doesn’t mention or consider is the Bikeability programme that has been running in Sheffield schools since, I think, 2007.  Over the last seven school years there must be approximately 10,000 students who, in their last two years of primary school, have attained Bikeability level 2 (basic standard to be out cycling on roads). The first cohort would have left secondary school by now.  I guess that many of these students did not cycle to their secondary schools and hardly cycle on the road now.  We know that most of the staff do not cycle and the cycle parking provision across all schools is very patchy.  The majority of parents do not want their children to cycle to school as they perceive it as hazardous.  This is a specific scheme but we need to ask what SCC is doing to monitor and evaluate its long term impact wrt to trained students carrying on cycling for transport or leisure?
  3. As for employees: Sheffield Council has promoted Cycle to Work schemes but the irony is that it has never introduced one for its own employees.  Despite many of the officers in positions of influence cycling to work themselves, the Council has spent years kicking this idea around the halls of bureaucracy and never doing it themselves.  The Council should be leading the way; it may be hypocritical to recommend actions you cannot or will not do yourself.  So we should re-iterate our request; when is SCC to introduce a Cycle to Work scheme for its own employees?
  4. Sheffield has a CycleBoost programme as well.  This is targeted on North East Sheffield and designed to get adults cycling for transport and wellbeing.  It has an extensive programme of cycle loans, cycle training, maintenance classes and a bike kitchen.  Its all good and started in 2013.  It’s funded from the Local Sustainable Transport Fund money and is part of the South Yorkshire In Motion! project.  Never heard of this? No neither had I until I happened to pick up a leaflet on it.  I think we need to ask CycleBoost to talk about its work at the next Cycle Forum and for SCC to talk about In Motion wrt to uptake of the various strands, coordination across South Yorkshire and what impact it has had so far, especially in Sheffield.

5. Action point 3 states, “The first principles of reducing the need to travel by car would be to ensure that all destinations are accessible to public transport, walking and cycling to ensure the provision of alternatives to the car.” , and action point 6 Develop policies to support states, “We will integrate policies for spatial and transport planning to reduce travel demand and open up possibilities for walking and cycling.”

  1.  I link these two points because I think it is stating that urban spaces or places where we work, rest, play and shop must be planned and developed, or redeveloped, with the needs of transport other than the car put first. To do this no space should be redeveloped unless transport designers are involved and no transport scheme should be developed unless urban space designers are involved, hence the proposed integration of spatial and transport planning. This could be interpreted as all designing should be done according to the hierarchy of road users, eg in order of consideration; able and disabled pedestrians, cyclists, public transport, commercial vehicles, private vehicles.  Its worth asking if this is what AQAP means?  And of course the other question, is when is SCC to introduce cycle audits? We still seem to be no closer to getting them as part of highway planning procedure, although it was agreed nine months ago it would take place.
  2. If SCC gets its act together to do then that would be a great improvement as long as politicians and officers hold their nerve.  When presenting AQAP to Cabinet Simon Green, Executive Director, Place stated, “….attempting to reduce emissions from traffic by using some form of demand management measure.  However, this may still not deliver the required air quality targets and EU limit values by 2015 and would also have a negative impact on Sheffield’s economy, working against the wider aims of the Corporate Plan.”  July 2012 papers presented to Cabinet.  What you can’t find is exactly what this negative impact is or would be and it is not identified in SCC’s Corporate Plan 2011-2014
  3. I think this blanket excuse of harming the economy must be resisted; the first question to ask is, “What is the negative economic cost of 500 preventable deaths caused by air quality per annum?”  And this is a legitimate question; the DfT’s own evaluation of Sheffield’s AQAP states,  “The Council is encouraged to consider the wider socio-economic impacts of the various measures, for instance encouraging cycling and walking has a health benefit beyond that of the expected air quality improvements, and it would be useful to consider this within the report.”  Defra response to SCC AQAP 2015 Sep 2012.  So I think we should ask at Cycle Forum what is the negative and positive economic impact of implementing AQAP 2015 and how do they compare?

Action point 6 goes on to say, “This (action) includes developing Park and Ride schemes, journey planning tools, cycle paths, cycle storage and better footpaths, subject to a successful funding bid. We will also be investing in public transport, such as the Bus Rapid Transit (BRT) Northern Route and support the implementation of the Government-led 2 year Tram-Train pilot scheme to promote innovation in sustainable travel, improve reliability and increase modal shift from cars to tram.”

  1. I think the important points here are
    1. to raise the issue of quality and coherence of cycle routes (not just paths) and to point out that putting in more does not necessarily make things better.
    2. to enquire how the BRT is to impact upon cycling, e.g. along Attercliffe Rd and using the 5WW around Meadowhall
    3. to note that the tram-train national pilot has vetoed carriage of bicycles despite the Council’s view and the Council’s need to develop a coherent view across the SCR on this issue.  This decision should be noted for when franchises are up for tender again.
  2. Action 6, Develop policies to support better air quality, also states that,
    1. a.    “We will introduce and enforce a planning policy to ensure that for significant developments predictable resulting loss of air quality would be appropriately mitigated.  We will expect all new developments to implement or support actions that make a positive contribution to improving air quality, such as by reducing the demand for fuel consumption.
    2. The proposed IKEA is a substantial development that has more or less ignored access for walkers or cyclists although Meadowhall must be one of the best linked places via public transport and could be for cycling.  Note this plan has been here since 2012 but seems to have given little backbone to Sheffield councillors and officers.  Is it negative economic impact to resist the wishes of developers?

Is AQAP worth pursuing?

It is of course linked to 20s Plenty, Living Streets and so on, so Richard is going to have a look at it from the Active Travel angle too.

I think It ‘fits’ with the demands we may make with Space for Cycling so we can use it as evidence/argument for our case

AND it also gives us an argument to take to community associations and TARAs to help build possible alliances for the 2014 and 2015 elections

Whether we make We Want Good Air Quality action an election demand is a moot point; I think we are pushing at an open door on that BUT we need to demand sound strategies for action on cycling and walking to ensure good air quality

For me actions like “We will maintain cycle training” don’t go far enough!  (on the realisation that if you don’t ask you won’t get and if you do ask it is highly likely you won’t get – but, hey! that’s campaigning for you)

Addendum: How is this all led and managed?

The plan has a steering group and a working group and a different officer championing  each of the above actions in each group!

14 people, 11 of them SCC officers, are members of the steering group.  16 people, 11 of them SCC officers, are members of the working group.  Two officers are both members of the steering group and the working group and those who are not officers are from agencies such as SYPTE, HA.

The working group should have a member of the local community assigned to each of the specific actions but currently there are no nominees and this plan will be finished in 2015.  That should be seven local community representatives in all making the working group a total of 23 members.

Its complicated but so is managing air quality.  However it may not be akin to a “lean environmental strategy team” as extolled on p20 of SCC’s Corporate Plan 2011-2014

The current documentation is out of date by the way as some people like Les Sturch have left SCC and the Government’s Local Sustainable Transport Fund no longer exists.

The other problem is that it will be very difficult to monitor and evaluate progress.  The Defra evaluation states, “ We note that the Plan includes a section on how progress will be monitored, and states that monitoring will be done by integrating the Plan into the Council’s performance management framework. This is welcomed, however it would be useful for the Council to define the indicators that will be used to evaluate progress with implementation of each measure, and to include the indicators and targets explicitly within the descriptions of each of the measures.  “

I couldn’t find a modus operandi for these groups, there are chairs and so on but I can’t find minutes, attendance so we can ask about that too.

 

Sky Rides to start in Sheffield in 2014. Ride leaders wanted.

Hi Folks
I’ve been in contact with Go Sky Ride today.
There will be Sky Rides in Sheffield starting in summer of 2014.
 The date they will start is still to be negotiated between the Council and Go Sky Ride.
The specific programme and the area it will cover is still to be decided as well.
Sky Ride will talk to anyone who has ideas for routes or routes already done etc 
and I have extended an invitation to them to come and talk with us at a CycleSheffield meeting
  • Meanwhile they want to start recruiting a ‘Sheffield’ team of Sky Ride leaders
  • The training course is free and takes one day.( I did it back in 2009 and led some Sky Rides in Manchester)
  • On successful completion you get a British Cycling Ride Leader qualification.
  • Ride leaders: have some admin to do; work with other ride leaders; should know the route;  be able to do safety checks on bikes; be able to do some basic bike maintenance and 1st Aid.
  • Ride leaders get: qualified; free membership of British Cycling; free Sky Ride kit; a payment for every ride they take part in.
  • The payment is small and not a career salary; the essential qualities are enjoying cycling and getting others enthusiastic about cycling.
and if you ride in a club or group with friends and colleagues who may be interested please pass the message on
and let me know by email where you have sent it on – ta!
best wishes
Mick Nott
Chair, CycleSheffield
07949 596702

CycleSheffield membership up 50% in a year!

CycleSheffield membership has risen by 50%  this year.

We now have 367 members.  More members means:

  • more political clout and influence, our basic work is political – with a small p;

  • more ears and eyes on the ground; the better the intelligence for us

  • a bigger pool of people willing to share campaigning tasks no matter how small or big

  • the more we can negotiate in terms of members benefits

  • the more the economies of scale and the more we have to spend on campaign/publicity materials and the less likely we need to raise subs

We are grateful that so many people are joining us.  It is good to see that so many people want to support safe & pleasant cycling for everybody in Sheffield.

Members benefits are at http://www.cyclesheffield.org.uk/2013/10/02/7715/ and are updated as and when we negotiate them.

We offer standard membership and we also offer affiliate membership to Sheffield CTC and other groups, clubs and BUGs that would value our membership for their members.

If you know somebody who would like to arrange this then ask them to contact membership@cyclesheffield.org.uk

 

Subs pa

Individual

Household

Concession

Standard subs

£6

£8 for all household members

£4 concessions student/unemployed.

Affiliate subs

£4

£5 for all household members

£3 concessions student/unemployed.

These aren’t proportional reductions but there what we have offered to groups – we can review it in the spring when we set our budget

Meanwhile please would you ask friends, family, colleagues to consider joining CycleSheffield.  Chris Rust has helpfully sent the email below to some of his friends and colleagues who he thinks would be interested in our work and directly supporting us.  Please use it as a template to send on to anyone you think would want to support us.

===========================================

Hi folks,

I’m writing because you are all cyclists that I know personally. Would you please take the trouble to sign up as a supporter (member) of the CycleSheffield campaign group who are doing great work to get the authorities to improve the lives of cyclists and make it possible for more people to cycle in our city? You don’t have to be an activist to join, although active members are very welcome.

You can find out more and join here http://www.cyclesheffield.org.uk/

It costs £6 for individuals and £8 for families. We have around 350 members and are aiming for more since nothing gets the attention of politicians better than knowing that a lot of voters are interested. Membership fees go towards the practical costs of campaigning. Members receive regular updates by email so you know what we are doing and can join in if you choose.

Recently we have persuaded the council to hold an enquiry into cycling which has gathered evidence from 150 people and organisations and is transforming the council’s understanding of people’s feelings about cycling and the barriers to more people using cycling for transport. After years of poor policy and patchy action we believe we are seeing a significant change in how our local authority understand cycling and a real wish to make progress towards a cycle friendly city.

Other campaigns and activities of CycleSheffield include:

  • Scrutiny of planning decisions and planned changes to roads to ensure that cycling is not overlooked (a constant struggle).

  • Regular consultation with the local authority to ensure that cycling is on their agenda

  • Campaigning for better provision for bikes on trains and (in future we hope) trams

  • Working for the CTC’s Road Justice Campaign to ensure that motorists who cause accidents with cyclists and pedestrians are properly prosecuted

  • Working with South Yorkshire Police to ensure that dangerous driving is dealt with and cycle routes are kept free of illegally parked cars

  • Campaigning to keep cycle routes open and free of problems, recently we worked with the council to ensure that cyclists on the well-used Sheaf Valley Cycle Route were not endangered by vehicles using the Virgin Active car park as a “rat run”.

  • Sheffield FridayNightRide a brilliant monthly social cycling event attracting up to 60 people

  • Nether Edge Bikebus, my own little project helping less confident cyclists find safe routes around this part of Sheffield

So if you think this is worthwhile and would like your name to be on our list of members to add weight to our campaigns please sign up.

NB, if you go for the Household or Family membership, every member of your family will count as another supporter so that’s a huge help.

Best wishes